IAC logo
IAC Assessment: AS0512
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0512
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2021
Principal Product Water softening pellets and granular salt
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales <$500,000
# of Employees 34
Plant Area (Sq.Ft.) 4,704,480
Annual Production 120,000 Tons
Production Hrs. Annual 8,472
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,220 2,551,882 kWh $0.06
Electricity Demand $90,908 5,997 kW-months/year $15.16
Electricity Fees $24,365 - $ -
Natural Gas $166,781 32,276 MMBtu $5.17
TOTAL ENERGY COSTS $441,274
RECOMMENDED SAVINGS* $146,553 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $131,005
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$131,005
Cost:
$500
- - - - $26,201 - $104,804 - -
-
kWh
-
-
kW-months/year
$26,201
-
$
$104,804
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,545
Cost:
$9,764
$4,463 104,510 $2,757 141 - - $(-675) - $4,463
104,510
kWh
$2,757
141
kW-months/year
-
-
$
$(-675)
-
$
03: 2.7145 INSTALL SKYLIGHTS Savings:
$3,915
Cost:
$15,962
$2,371 55,531 $1,544 79 - - - - $2,371
55,531
kWh
$1,544
79
kW-months/year
-
-
$
-
-
$
04: 2.6125 KEEP EQUIPMENT CLEAN Savings:
$3,083
Cost:
$3,482
$(-437) (-10,220) $(-297) (-15) - - $3,817 - $(-437)
(-10,220)
kWh
$(-297)
(-15)
kW-months/year
-
-
$
$3,817
-
$
05: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$2,005
Cost:
$650
$1,335 31,269 $670 34 - - - - $1,335
31,269
kWh
$670
34
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$146,553
Cost:
$30,358
$7,732 181,090 $4,674 239 $26,201 - $107,946 - $7,732
181,090
kWh
$4,674
239
kW-months/year
$26,201
-
$
$107,946
-
$
TOTAL IMPLEMENTED Savings:
$131,005
Cost:
$500
- - - - $26,201 - $104,804 - -
-
kWh
-
-
kW-months/year
$26,201
-
$
$104,804
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost