IAC Assessment: AS0513
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2022
Principal Product Defense Contracting
NAICS 334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812 - Search And Navigation Equipment
Sales <$500,000
# of Employees 900
Plant Area (Sq.Ft.) 660,000
Annual Production 1 Units
Production Hrs. Annual 5,858
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $943,954 19,024,134 kWh $0.05
Electricity Demand $218,046 32,497 kW-months/year $6.71
Electricity Fees $404,462 - $ -
Natural Gas $138,977 20,258 MMBtu $6.86
TOTAL ENERGY COSTS $1,705,439
RECOMMENDED SAVINGS* $236,214 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Other Gas Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$90,618
Cost:
$28,940
$75,897 1,530,162 $14,721 2,194 - - - - - - - - $75,897
1,530,162
kWh
$14,721
2,194
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$63,678
Cost:
$302,167
$51,528 1,038,807 $21,548 3,211 - - - - - - $(-9,398) - $51,528
1,038,807
kWh
$21,548
3,211
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$(-9,398)
-
$
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$44,875
Cost:
$580,160
$32,767 605,282 $12,108 1,060 - - - - - - - - $32,767
605,282
kWh
$12,108
1,060
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$15,767
Cost:
$43,000
$(-1,666) (-33,580) - - - - $17,433 3,236 - - - - $(-1,666)
(-33,580)
kWh
-
-
kW-months/year
-
-
MMBtu
$17,433
3,236
MMBtu
-
-
$
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$11,700
Cost:
$453
- - - - - - - - - - $11,700 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$11,700
-
$
06: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$6,454
Cost:
$122
$22,321 450,017 $4,133 616 - - - - $(-20,000) - - - $22,321
450,017
kWh
$4,133
616
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-20,000)
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,979
Cost:
$1,772
$1,643 33,126 $336 50 - - - - - - - - $1,643
33,126
kWh
$336
50
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,143
Cost:
$411
- - - - $1,578 230 - - $(-435) - - - -
-
kWh
-
-
kW-months/year
$1,578
230
MMBtu
-
-
MMBtu
$(-435)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$236,214
Cost:
$957,025
$182,490 3,623,814 $52,846 7,131 $1,578 230 $17,433 3,236 $(-20,435) - $2,302 - $182,490
3,623,814
kWh
$52,846
7,131
kW-months/year
$1,578
230
MMBtu
$17,433
3,236
MMBtu
$(-20,435)
-
$
$2,302
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Other Gas Ancillary Material Cost One-time Revenue or Avoided Cost