Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2022 |
Principal Product | Defense Contracting |
NAICS | 334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur |
SIC | 3812 - Search And Navigation Equipment |
Sales | <$500,000 |
# of Employees | 900 |
Plant Area (Sq.Ft.) | 660,000 |
Annual Production | 1 Units |
Production Hrs. Annual | 5,858 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $943,954 | 19,024,134 | kWh | $0.05 |
Electricity Demand | $218,046 | 32,497 | kW-months/year | $6.71 |
Electricity Fees | $404,462 | - | $ | - |
Natural Gas | $138,977 | 20,258 | MMBtu | $6.86 |
TOTAL ENERGY COSTS | $1,705,439 | |||
RECOMMENDED SAVINGS* | $236,214 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Gas | Ancillary Material Cost | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Gas | Ancillary Material Cost | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $90,618 Cost: $28,940 |
$75,897 | 1,530,162 | $14,721 | 2,194 | - | - | - | - | - | - | - | - |
$75,897 1,530,162 kWh |
$14,721 2,194 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $63,678 Cost: $302,167 |
$51,528 | 1,038,807 | $21,548 | 3,211 | - | - | - | - | - | - | $(-9,398) | - |
$51,528 1,038,807 kWh |
$21,548 3,211 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
$(-9,398) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $44,875 Cost: $580,160 |
$32,767 | 605,282 | $12,108 | 1,060 | - | - | - | - | - | - | - | - |
$32,767 605,282 kWh |
$12,108 1,060 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $15,767 Cost: $43,000 |
$(-1,666) | (-33,580) | - | - | - | - | $17,433 | 3,236 | - | - | - | - |
$(-1,666) (-33,580) kWh |
- - kW-months/year |
- - MMBtu |
$17,433 3,236 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $11,700 Cost: $453 |
- | - | - | - | - | - | - | - | - | - | $11,700 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
$11,700 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM |
Savings: $6,454 Cost: $122 |
$22,321 | 450,017 | $4,133 | 616 | - | - | - | - | $(-20,000) | - | - | - |
$22,321 450,017 kWh |
$4,133 616 kW-months/year |
- - MMBtu |
- - MMBtu |
$(-20,000) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,979 Cost: $1,772 |
$1,643 | 33,126 | $336 | 50 | - | - | - | - | - | - | - | - |
$1,643 33,126 kWh |
$336 50 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,143 Cost: $411 |
- | - | - | - | $1,578 | 230 | - | - | $(-435) | - | - | - |
- - kWh |
- - kW-months/year |
$1,578 230 MMBtu |
- - MMBtu |
$(-435) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $236,214 Cost: $957,025 |
$182,490 | 3,623,814 | $52,846 | 7,131 | $1,578 | 230 | $17,433 | 3,236 | $(-20,435) | - | $2,302 | - | $182,490 3,623,814 kWh |
$52,846 7,131 kW-months/year |
$1,578 230 MMBtu |
$17,433 3,236 MMBtu |
$(-20,435) - $ |
$2,302 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Gas | Ancillary Material Cost | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Gas | Ancillary Material Cost | One-time Revenue or Avoided Cost |