IAC logo
IAC Assessment: AS0516
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0516
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2022
Principal Product Sporting Goods
NAICS 451110 - Sporting Goods Stores
SIC 5941 - Sporting Goods And Bicycle Shops
Sales $10,000,000-$50,000,000
# of Employees 209
Plant Area (Sq.Ft.) 165,000
Annual Production 1 Units
Production Hrs. Annual 5,096
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $253,366 4,158,929 kWh $0.06
Electricity Demand $73,026 7,724 kW-months/year $9.45
Electricity Fees $40,089 - $ -
Natural Gas $1,097 67 MMBtu $16.42
TOTAL ENERGY COSTS $367,578
RECOMMENDED SAVINGS* $88,945 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,294
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$24,479
Cost:
$45,639
$24,479 401,954 - - - - $24,479
401,954
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$407
Cost:
$133
$107 1,752 $22 2 $278 17 $107
1,752
kWh
$22
2
kW-months/year
$278
17
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,894
Cost:
$22,335
$6,510 106,896 $1,384 146 - - $6,510
106,896
kWh
$1,384
146
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$55,838
Cost:
$170,361
$43,061 707,075 $12,777 1,352 - - $43,061
707,075
kWh
$12,777
1,352
kW-months/year
-
-
MMBtu
05: 2.1134 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES Savings:
$49
Cost:
$165
- - - - $49 3 -
-
kWh
-
-
kW-months/year
$49
3
MMBtu
06: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$278
Cost:
$189
$167 2,746 $111 12 - - $167
2,746
kWh
$111
12
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$88,945
Cost:
$238,822
$74,324 1,220,423 $14,294 1,512 $327 20 $74,324
1,220,423
kWh
$14,294
1,512
kW-months/year
$327
20
MMBtu
TOTAL IMPLEMENTED Savings:
$56,294
Cost:
$170,659
$43,168 708,827 $12,799 1,354 $327 20 $43,168
708,827
kWh
$12,799
1,354
kW-months/year
$327
20
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas