IAC logo
IAC Assessment: AS0517
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0517
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2022
Principal Product Aerospace components
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 243,000
Annual Production 11,500 Units
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $529,992 7,326,400 kWh $0.07
Electricity Demand $77,418 15,096 kW-months/year $5.13
Electricity Fees $14,836 - $ -
TOTAL ENERGY COSTS $622,246
RECOMMENDED SAVINGS* $84,126 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,298
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$47,690
Cost:
$126,497
$44,451 614,808 $3,239 632 - - - - $44,451
614,808
kWh
$3,239
632
kW-months/year
-
-
gal
-
-
$
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$11,446
Cost:
$48,382
$(-1,260) (-17,422) - - $12,706 4,706 - - $(-1,260)
(-17,422)
kWh
-
-
kW-months/year
$12,706
4,706
gal
-
-
$
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$10,522
Cost:
$15,516
$8,916 123,335 $1,606 313 - - - - $8,916
123,335
kWh
$1,606
313
kW-months/year
-
-
gal
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$8,331
Cost:
$39,600
$7,593 105,026 $738 144 - - - - $7,593
105,026
kWh
$738
144
kW-months/year
-
-
gal
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,692
Cost:
$2,880
$2,462 34,055 $230 45 - - - - $2,462
34,055
kWh
$230
45
kW-months/year
-
-
gal
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,189
Cost:
$859
$1,986 27,472 $115 23 - - $88 - $1,986
27,472
kWh
$115
23
kW-months/year
-
-
gal
$88
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,256
Cost:
$1,541
$1,145 15,841 $111 22 - - - - $1,145
15,841
kWh
$111
22
kW-months/year
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$84,126
Cost:
$235,275
$65,293 903,115 $6,039 1,178 $12,706 4,706 $88 - $65,293
903,115
kWh
$6,039
1,178
kW-months/year
$12,706
4,706
gal
$88
-
$
TOTAL IMPLEMENTED Savings:
$22,298
Cost:
$57,516
$19,640 271,674 $2,570 501 - - $88 - $19,640
271,674
kWh
$2,570
501
kW-months/year
-
-
gal
$88
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Ancillary Material Cost