IAC logo
IAC Assessment: AS0519
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0519
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2022
Principal Product Manufactured Homes
NAICS 321991 - Manufactured Home (Mobile Home) Manufacturing
SIC 2451 - Mobile Homes
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 220,405
Annual Production 1,500 Pieces
Production Hrs. Annual 2,154
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,327 1,117,360 kWh $0.09
Electricity Demand $40,943 4,790 kW-months/year $8.55
Electricity Fees $15,563 - $ -
TOTAL ENERGY COSTS $160,833
RECOMMENDED SAVINGS* $126,325 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $113,583
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Gas Ancillary Material Cost Electricity Usage Electricity Demand Other Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$65,138
Cost:
$509,120
$48,749 521,941 $16,389 1,917 - - - - $48,749
521,941
kWh
$16,389
1,917
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$30,335
Cost:
$11,420
$26,958 288,638 $3,377 395 - - - - $26,958
288,638
kWh
$3,377
395
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$12,742
Cost:
$43,469
$(-2,638) (-28,247) - - $15,380 5,006 - - $(-2,638)
(-28,247)
kWh
-
-
kW-months/year
$15,380
5,006
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,189
Cost:
$17,273
$8,286 88,708 $1,814 212 - - $1,089 - $8,286
88,708
kWh
$1,814
212
kW-months/year
-
-
MMBtu
$1,089
-
$
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$4,322
Cost:
$7,738
$3,142 33,641 $1,180 138 - - - - $3,142
33,641
kWh
$1,180
138
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,247
Cost:
$3,455
$1,997 21,384 $250 29 - - - - $1,997
21,384
kWh
$250
29
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$352
Cost:
$830
$312 3,344 $40 5 - - - - $312
3,344
kWh
$40
5
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$126,325
Cost:
$593,305
$86,806 929,409 $23,050 2,696 $15,380 5,006 $1,089 - $86,806
929,409
kWh
$23,050
2,696
kW-months/year
$15,380
5,006
MMBtu
$1,089
-
$
TOTAL IMPLEMENTED Savings:
$113,583
Cost:
$549,836
$89,444 957,656 $23,050 2,696 - - $1,089 - $89,444
957,656
kWh
$23,050
2,696
kW-months/year
-
-
MMBtu
$1,089
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Other Gas Ancillary Material Cost Electricity Usage Electricity Demand Other Gas Ancillary Material Cost