IAC logo
IAC Assessment: AS0521
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0521
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2022
Principal Product Bread, Cake - not forzen
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 80,000
Annual Production 5,600,000 Units
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $237,245 3,293,840 kWh $0.07
Electricity Demand $31,864 6,319 kW-months/year $5.04
Electricity Fees $5,466 - $ -
Natural Gas $392,798 43,035 MMBtu $9.13
TOTAL ENERGY COSTS $667,373
RECOMMENDED SAVINGS* $82,316 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $81,561
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$52,178
Cost:
$1,517
- - - - $52,178 63,773 -
-
kWh
-
-
kW-months/year
$52,178
63,773
lb
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,344
Cost:
$6,500
$25,999 361,100 $2,345 465 - - $25,999
361,100
kWh
$2,345
465
kW-months/year
-
-
lb
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$755
Cost:
$5,520
$689 9,567 $66 13 - - $689
9,567
kWh
$66
13
kW-months/year
-
-
lb
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$835
Cost:
$814
$763 10,599 $72 14 - - $763
10,599
kWh
$72
14
kW-months/year
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$191
Cost:
$514
$177 2,459 $14 3 - - $177
2,459
kWh
$14
3
kW-months/year
-
-
lb
06: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$13
Cost:
$109
$13 177 - - - - $13
177
kWh
-
-
kW-months/year
-
-
lb
TOTAL RECOMMENDED Savings:
$82,316
Cost:
$14,974
$27,641 383,902 $2,497 495 $52,178 63,773 $27,641
383,902
kWh
$2,497
495
kW-months/year
$52,178
63,773
lb
TOTAL IMPLEMENTED Savings:
$81,561
Cost:
$9,454
$26,952 374,335 $2,431 482 $52,178 63,773 $26,952
374,335
kWh
$2,431
482
kW-months/year
$52,178
63,773
lb
Savings
Cost
$ kWh $ kW-months/year $ lb