IAC Assessment: AS0523
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0523
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2022
Principal Product Treated wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 12
Plant Area (Sq.Ft.) 381,150
Annual Production 40,200 Thousand Gallons
Production Hrs. Annual 3,285
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,194 1,167,663 kWh $0.08
Electricity Demand $63,850 4,708 kW-months/year $13.56
Electricity Fees $35,756 - $ -
TOTAL ENERGY COSTS $196,800
RECOMMENDED SAVINGS* $56,638 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,638
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$42,697
Cost:
$89,337
- - - - $1,097 - $41,600 - - - -
-
kWh
-
-
kW-months/year
$1,097
-
$
$41,600
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,604
Cost:
$200
$6,685 - $3,919 - - - - - - - $6,685
-
kWh
$3,919
-
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,300
Cost:
$7,808
$682 8,191 $618 46 - - - - - - $682
8,191
kWh
$618
46
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,242
Cost:
$2,695
$624 7,501 $589 44 - - - - $29 - $624
7,501
kWh
$589
44
kW-months/year
-
-
$
-
-
$
$29
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$414
Cost:
$328
$414 4,978 - - - - - - - - $414
4,978
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$381
Cost:
$32
$187 2,249 $194 14 - - - - - - $187
2,249
kWh
$194
14
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$56,638
Cost:
$100,400
$8,592 22,919 $5,320 104 $1,097 - $41,600 - $29 - $8,592
22,919
kWh
$5,320
104
kW-months/year
$1,097
-
$
$41,600
-
$
$29
-
$
TOTAL IMPLEMENTED Savings:
$56,638
Cost:
$100,400
$8,592 22,919 $5,320 104 $1,097 - $41,600 - $29 - $8,592
22,919
kWh
$5,320
104
kW-months/year
$1,097
-
$
$41,600
-
$
$29
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost