Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2022 |
Principal Product | baked buns and bread |
NAICS | 311812 - Commercial Bakeries |
SIC | 2051 - Bread, Cake, And Related Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 135,000 |
Annual Production | 115,000,000 Pounds |
Production Hrs. Annual | 8,712 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $469,783 | 7,403,412 | kWh | $0.06 |
Electricity Demand | $90,353 | 17,240 | kW-months/year | $5.24 |
Electricity Fees | $22,058 | - | $ | - |
Natural Gas | $274,969 | 62,294 | MMBtu | $4.41 |
TOTAL ENERGY COSTS | $857,163 | |||
RECOMMENDED SAVINGS* | $25,222 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,218 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $20,000 Cost: $450 |
- | - | - | - | - | - | $20,000 | 55,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$20,000 55,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,218 Cost: $1,951 |
$2,919 | 46,326 | $299 | 57 | - | - | - | - | - | - |
$2,919 46,326 kWh |
$299 57 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,431 Cost: $4,511 |
$1,190 | 18,884 | $241 | 46 | - | - | - | - | - | - |
$1,190 18,884 kWh |
$241 46 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $255 Cost: $410 |
- | - | - | - | $706 | 160 | - | - | $(-451) | - |
- - kWh |
- - kW-months/year |
$706 160 MMBtu |
- - lb |
$(-451) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $318 Cost: $980 |
$287 | 4,561 | $31 | 6 | - | - | - | - | - | - |
$287 4,561 kWh |
$31 6 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $25,222 Cost: $8,302 |
$4,396 | 69,771 | $571 | 109 | $706 | 160 | $20,000 | 55,000 | $(-451) | - | $4,396 69,771 kWh |
$571 109 kW-months/year |
$706 160 MMBtu |
$20,000 55,000 lb |
$(-451) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,218 Cost: $2,401 |
$2,919 | 46,326 | $299 | 57 | - | - | $20,000 | 55,000 | - | - | $2,919 46,326 kWh |
$299 57 kW-months/year |
- - MMBtu |
$20,000 55,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost |