IAC Assessment: AS0534
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0534
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2022
Principal Product baked buns and bread
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $50,000,000-$100,000,000
# of Employees 170
Plant Area (Sq.Ft.) 135,000
Annual Production 115,000,000 Pounds
Production Hrs. Annual 8,712
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $469,783 7,403,412 kWh $0.06
Electricity Demand $90,353 17,240 kW-months/year $5.24
Electricity Fees $22,058 - $ -
Natural Gas $274,969 62,294 MMBtu $4.41
TOTAL ENERGY COSTS $857,163
RECOMMENDED SAVINGS* $25,222 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,218
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$20,000
Cost:
$450
- - - - - - $20,000 55,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$20,000
55,000
lb
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,218
Cost:
$1,951
$2,919 46,326 $299 57 - - - - - - $2,919
46,326
kWh
$299
57
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,431
Cost:
$4,511
$1,190 18,884 $241 46 - - - - - - $1,190
18,884
kWh
$241
46
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$255
Cost:
$410
- - - - $706 160 - - $(-451) - -
-
kWh
-
-
kW-months/year
$706
160
MMBtu
-
-
lb
$(-451)
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$318
Cost:
$980
$287 4,561 $31 6 - - - - - - $287
4,561
kWh
$31
6
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$25,222
Cost:
$8,302
$4,396 69,771 $571 109 $706 160 $20,000 55,000 $(-451) - $4,396
69,771
kWh
$571
109
kW-months/year
$706
160
MMBtu
$20,000
55,000
lb
$(-451)
-
$
TOTAL IMPLEMENTED Savings:
$23,218
Cost:
$2,401
$2,919 46,326 $299 57 - - $20,000 55,000 - - $2,919
46,326
kWh
$299
57
kW-months/year
-
-
MMBtu
$20,000
55,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost