IAC Assessment: AS0543
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0543
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2023
Principal Product treated wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 9
Plant Area (Sq.Ft.) 10,773
Annual Production 8,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,180 907,100 kWh $0.08
Electricity Demand $28,928 3,277 kW-months/year $8.83
TOTAL ENERGY COSTS $105,108
RECOMMENDED SAVINGS* $19,254 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,753
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,420
Cost:
$76,246
$11,102 132,161 $4,318 489 - - $11,102
132,161
kWh
$4,318
489
kW-months/year
-
-
$
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$1,804
Cost:
$8,019
$1,874 22,312 $(-70) (-8) - - $1,874
22,312
kWh
$(-70)
(-8)
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,306
Cost:
$2,116
$779 9,283 $473 54 $54 - $779
9,283
kWh
$473
54
kW-months/year
$54
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$493
Cost:
$25
$280 3,329 $213 24 - - $280
3,329
kWh
$213
24
kW-months/year
-
-
$
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$150
Cost:
$92
$88 1,043 $62 7 - - $88
1,043
kWh
$62
7
kW-months/year
-
-
$
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$81
Cost:
$222
$81 966 - - - - $81
966
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$19,254
Cost:
$86,720
$14,204 169,094 $4,996 566 $54 - $14,204
169,094
kWh
$4,996
566
kW-months/year
$54
-
$
TOTAL IMPLEMENTED Savings:
$3,753
Cost:
$10,252
$3,021 35,967 $678 77 $54 - $3,021
35,967
kWh
$678
77
kW-months/year
$54
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost