IAC Assessment: AS0544
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0544
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2023
Principal Product treated wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 7
Plant Area (Sq.Ft.) 325,500
Annual Production 300,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,487 1,229,760 kWh $0.07
Electricity Demand $14,255 1,296 kW-months/year $11.00
Electricity Fees $18,064 - $ -
TOTAL ENERGY COSTS $120,806
RECOMMENDED SAVINGS* $46,282 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,226
Cost:
$18,665
$18,706 259,954 $3,520 320 - - $18,706
259,954
kWh
$3,520
320
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,200
Cost:
$21,887
$10,164 141,250 $3,036 276 - - $10,164
141,250
kWh
$3,036
276
kW-months/year
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$8,391
Cost:
$6,033
$7,060 98,112 $1,331 121 - - $7,060
98,112
kWh
$1,331
121
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,591
Cost:
$2,841
$1,172 16,293 $243 22 $176 - $1,172
16,293
kWh
$243
22
kW-months/year
$176
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$874
Cost:
$1,115
$724 10,054 $150 14 - - $724
10,054
kWh
$150
14
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$46,282
Cost:
$50,541
$37,826 525,663 $8,280 753 $176 - $37,826
525,663
kWh
$8,280
753
kW-months/year
$176
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost