Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2023 |
Principal Product | Social Services & Food Distribution |
NAICS | 624210 - Community Food Services |
SIC | 8399 - Social Services, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 88,519 |
Annual Production | 1,600,000 Units |
Production Hrs. Annual | 4,380 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $92,354 | 1,797,587 | kWh | $0.05 |
Electricity Demand | $15,402 | 2,172 | kW-months/year | $7.09 |
Electricity Fees | $104,724 | - | $ | - |
TOTAL ENERGY COSTS | $212,480 | |||
RECOMMENDED SAVINGS* | $61,507 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $60,558 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $41,664 Cost: $123,750 |
$(-13,214) | (-259,105) | $(-3,985) | (-562) | $58,863 | 5,597 | - | - |
$(-13,214) (-259,105) kWh |
$(-3,985) (-562) kW-months/year |
$58,863 5,597 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $15,226 Cost: $17,834 |
$9,982 | 195,730 | $1,911 | 270 | - | - | $3,333 | - |
$9,982 195,730 kWh |
$1,911 270 kW-months/year |
- - MMBtu |
$3,333 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $3,340 Cost: $6,151 |
$3,340 | 65,495 | - | - | - | - | - | - |
$3,340 65,495 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $800 Cost: $685 |
$746 | 14,619 | $54 | 8 | - | - | - | - |
$746 14,619 kWh |
$54 8 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $328 Cost: $540 |
$328 | 6,421 | - | - | - | - | - | - |
$328 6,421 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $149 Cost: $277 |
$123 | 2,404 | $26 | 4 | - | - | - | - |
$123 2,404 kWh |
$26 4 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,507 Cost: $149,237 |
$1,305 | 25,564 | $(-1,994) | (-280) | $58,863 | 5,597 | $3,333 | - | $1,305 25,564 kWh |
$(-1,994) (-280) kW-months/year |
$58,863 5,597 MMBtu |
$3,333 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $60,558 Cost: $148,275 |
$436 | 8,541 | $(-2,074) | (-292) | $58,863 | 5,597 | $3,333 | - | $436 8,541 kWh |
$(-2,074) (-292) kW-months/year |
$58,863 5,597 MMBtu |
$3,333 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |