IAC logo
IAC Assessment: AS0559
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0559
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2023
Principal Product aerospace machined components
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 50,000
Annual Production 58,023 Units
Production Hrs. Annual 6,160
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $123,235 1,553,360 kWh $0.08
Electricity Demand $20,641 5,708 kW-months/year $3.62
Electricity Fees $14,523 - $ -
TOTAL ENERGY COSTS $158,399
RECOMMENDED SAVINGS* $50,668 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$19,170
Cost:
$219,972
$18,822 232,375 $348 111 - - $18,822
232,375
kWh
$348
111
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,967
Cost:
$325
$11,262 142,019 $705 195 - - $11,262
142,019
kWh
$705
195
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,376
Cost:
$6,232
$3,680 46,401 $229 63 $1,467 - $3,680
46,401
kWh
$229
63
kW-months/year
$1,467
-
$
04: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$4,898
Cost:
$1,744
$4,314 54,368 $584 147 - - $4,314
54,368
kWh
$584
147
kW-months/year
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,469
Cost:
$166
$4,172 52,605 $297 82 - - $4,172
52,605
kWh
$297
82
kW-months/year
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,205
Cost:
$248
$388 4,895 $3,817 1,054 - - $388
4,895
kWh
$3,817
1,054
kW-months/year
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$320
Cost:
$235
$296 3,730 $24 7 - - $296
3,730
kWh
$24
7
kW-months/year
-
-
$
08: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$263
Cost:
$660
$263 3,313 - - - - $263
3,313
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$50,668
Cost:
$229,582
$43,197 539,706 $6,004 1,659 $1,467 - $43,197
539,706
kWh
$6,004
1,659
kW-months/year
$1,467
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost