IAC logo
IAC Assessment: AS0560
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0560
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2023
Principal Product metal powders
NAICS 332117 - Powder Metallurgy Part Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 95
Plant Area (Sq.Ft.) 52,000
Annual Production 2,866,009 Pounds
Production Hrs. Annual 5,000
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $240,497 4,339,200 kWh $0.06
Electricity Demand $316,013 17,466 kW-months/year $18.09
Electricity Fees $37,776 - $ -
Other Energy $970,928 179,830 MMBtu $5.40
TOTAL ENERGY COSTS $1,565,214
RECOMMENDED SAVINGS* $781,424 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$701,165
Cost:
$7,692,249
- - - - $(-269,763) - - - $970,928 - -
-
kWh
-
-
kW-months/year
$(-269,763)
-
$
-
-
$
$970,928
-
$
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$51,728
Cost:
$659,540
$35,610 642,771 $16,118 891 - - - - - - $35,610
642,771
kWh
$16,118
891
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$21,635
Cost:
$819,000
$21,635 390,528 - - - - - - - - $21,635
390,528
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$5,025
Cost:
$75,360
- - - - - - $5,025 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,025
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,759
Cost:
$9,900
$1,008 18,198 $751 41 - - - - - - $1,008
18,198
kWh
$751
41
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$112
Cost:
$414
$58 1,053 $54 3 - - - - - - $58
1,053
kWh
$54
3
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$781,424
Cost:
$9,256,463
$58,311 1,052,550 $16,923 935 $(-269,763) - $5,025 - $970,928 - $58,311
1,052,550
kWh
$16,923
935
kW-months/year
$(-269,763)
-
$
$5,025
-
$
$970,928
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Primary Product