IAC logo
IAC Assessment: AS0563
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0563
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2023
Principal Product Hospitality services
NAICS 721110 - Hotels (except Casino Hotels) and Motels
SIC 7011 - Hotels And Motels
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 625,289
Annual Production 1 Units
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $176,451 3,929,176 kWh $0.04
Electricity Demand $123,079 7,534 kW-months/year $16.34
Electricity Fees $94,082 - $ -
Natural Gas $241,262 62,995 MMBtu $3.83
TOTAL ENERGY COSTS $634,874
RECOMMENDED SAVINGS* $62,976 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$24,380
Cost:
$2,114
$12,276 273,394 $12,104 741 - - - - - - $12,276
273,394
kWh
$12,104
741
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$20,707
Cost:
$53,376
$6,175 137,521 $6,087 373 $8,445 2,205 - - - - $6,175
137,521
kWh
$6,087
373
kW-months/year
$8,445
2,205
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,261
Cost:
$14,447
$5,250 116,978 $2,683 164 - - $1,328 - - - $5,250
116,978
kWh
$2,683
164
kW-months/year
-
-
MMBtu
$1,328
-
$
-
-
$
04: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$4,800
Cost:
$481
- - - - $4,930 1,287 - - $(-130) - -
-
kWh
-
-
kW-months/year
$4,930
1,287
MMBtu
-
-
$
$(-130)
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,177
Cost:
$4,584
$2,118 47,238 $1,059 65 - - - - - - $2,118
47,238
kWh
$1,059
65
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$651
Cost:
$106
$404 9,004 $201 12 - - $46 - - - $404
9,004
kWh
$201
12
kW-months/year
-
-
MMBtu
$46
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$62,976
Cost:
$75,108
$26,223 584,135 $22,134 1,355 $13,375 3,492 $1,374 - $(-130) - $26,223
584,135
kWh
$22,134
1,355
kW-months/year
$13,375
3,492
MMBtu
$1,374
-
$
$(-130)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost