IAC logo
IAC Assessment: AS0564
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0564
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2023
Principal Product Truck water systems, tanks and tank kits
NAICS 332420 - Metal Tank (Heavy Gauge) Manufacturing
SIC 3713 - Truck And Bus Bodies
Sales $10,000,000-$50,000,000
# of Employees 29
Plant Area (Sq.Ft.) 60,147
Annual Production 189 Units
Production Hrs. Annual 2,600
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,012 586,000 kWh $0.12
Electricity Demand $31,864 2,872 kW-months/year $11.09
Electricity Fees $5,401 - $ -
Natural Gas $11,415 741 MMBtu $15.40
TOTAL ENERGY COSTS $117,692
RECOMMENDED SAVINGS* $41,122 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,326
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Ancillary Material Cost Electricity Usage Electricity Demand Water Usage Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$30,388
Cost:
$182,064
$27,958 237,334 $2,430 219 - - - - $27,958
237,334
kWh
$2,430
219
kW-months/year
-
-
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,294
Cost:
$1,654
$3,558 30,200 $456 41 - - $280 - $3,558
30,200
kWh
$456
41
kW-months/year
-
-
Tgal
$280
-
$
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$2,752
Cost:
$63
$2,416 20,510 $336 30 - - - - $2,416
20,510
kWh
$336
30
kW-months/year
-
-
Tgal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,251
Cost:
$143
$1,991 16,900 $260 23 - - - - $1,991
16,900
kWh
$260
23
kW-months/year
-
-
Tgal
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$945
Cost:
$110
$814 6,914 $131 12 - - - - $814
6,914
kWh
$131
12
kW-months/year
-
-
Tgal
-
-
$
06: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$463
Cost:
$71
$459 3,893 $4 0 - - - - $459
3,893
kWh
$4
0
kW-months/year
-
-
Tgal
-
-
$
07: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$29
Cost:
$79
- - - - $29 4 - - -
-
kWh
-
-
kW-months/year
$29
4
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$41,122
Cost:
$184,184
$37,196 315,751 $3,617 325 $29 4 $280 - $37,196
315,751
kWh
$3,617
325
kW-months/year
$29
4
Tgal
$280
-
$
TOTAL IMPLEMENTED Savings:
$9,326
Cost:
$1,939
$7,965 67,610 $1,052 94 $29 4 $280 - $7,965
67,610
kWh
$1,052
94
kW-months/year
$29
4
Tgal
$280
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Usage Ancillary Material Cost Electricity Usage Electricity Demand Water Usage Ancillary Material Cost