Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2024
Principal Product copper clad laminate for pcbs
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 118,383
Annual Production 4,000,000 Units
Production Hrs. Annual 6,214
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $473,267 5,839,200 kWh $0.08
Electricity Demand $59,402 11,622 kW-months/year $5.11
Electricity Fees $17,257 - $ -
Natural Gas $84,974 13,580 MMBtu $6.26
TOTAL ENERGY COSTS $634,900
RECOMMENDED SAVINGS* $64,178 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$29,273
Cost:
$271,736
$28,947 357,376 $326 64 - - - - $28,947
357,376
kWh
$326
64
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,540
Cost:
$1,389
$18,409 227,276 $2,131 417 - - - - $18,409
227,276
kWh
$2,131
417
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$12,135
Cost:
$501
- - - - $12,395 1,980 $(-260) - -
-
kWh
-
-
kW-months/year
$12,395
1,980
MMBtu
$(-260)
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,317
Cost:
$2,384
$1,317 16,263 - - - - - - $1,317
16,263
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$649
Cost:
$152
$596 7,350 $53 10 - - - - $596
7,350
kWh
$53
10
kW-months/year
-
-
MMBtu
-
-
$
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$264
Cost:
$267
$234 2,883 $30 6 - - - - $234
2,883
kWh
$30
6
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$64,178
Cost:
$276,429
$49,503 611,148 $2,540 497 $12,395 1,980 $(-260) - $49,503
611,148
kWh
$2,540
497
kW-months/year
$12,395
1,980
MMBtu
$(-260)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost