IAC logo
IAC Assessment: AS0583
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0583
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2024
Principal Product Plumbing Fixtures
NAICS 326191 - Plastics Plumbing Fixture Manufacturing
SIC 3088 - Plastics Plumbing Fixtures
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 151,338
Annual Production 110,000 Units
Production Hrs. Annual 2,270
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,608 1,944,360 kWh $0.07
Electricity Demand $80,271 8,909 kW-months/year $9.01
Electricity Fees $1,824 - $ -
LPG $436,674 20,782 MMBtu $21.01
Fuel Oil #1 $877,473 31,050 MMBtu $28.26
TOTAL ENERGY COSTS $1,525,850
RECOMMENDED SAVINGS* $137,941 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #1 One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Fuel Oil #1 One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$87,396
Cost:
$642,159
$60,083 900,795 $27,313 3,031 - - - - - - $60,083
900,795
kWh
$27,313
3,031
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE Savings:
$43,888
Cost:
$15,124
- - - - $43,888 1,553 - - - - -
-
kWh
-
-
kW-months/year
$43,888
1,553
MMBtu
-
-
$
-
-
$
03: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$4,022
Cost:
$1,805
- - - - - - - - $4,022 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,022
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,282
Cost:
$4,696
$1,331 19,964 $951 106 - - - - - - $1,331
19,964
kWh
$951
106
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$137
Cost:
$172
$137 2,051 - - - - - - - - $137
2,051
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$122
Cost:
$476
$71 1,059 $51 6 - - - - - - $71
1,059
kWh
$51
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$94
Cost:
$52
$30 445 $22 2 - - $42 - - - $30
445
kWh
$22
2
kW-months/year
-
-
MMBtu
$42
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$137,941
Cost:
$664,484
$61,652 924,314 $28,337 3,145 $43,888 1,553 $42 - $4,022 - $61,652
924,314
kWh
$28,337
3,145
kW-months/year
$43,888
1,553
MMBtu
$42
-
$
$4,022
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #1 One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Fuel Oil #1 One-time Revenue or Avoided Cost Primary Product