IAC logo
IAC Assessment: AS0586
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0586
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2024
Principal Product Education
NAICS 611110 - Elementary and Secondary Schools
SIC 8211 - Elementary And Secondary Schools
Sales <$500,000
# of Employees 115
Plant Area (Sq.Ft.) 1,520,962
Annual Production 1 Units
Production Hrs. Annual 2,540
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,468 966,261 kWh $0.11
Electricity Demand $30,100 2,899 kW-months/year $10.38
Electricity Fees $33,941 - $ -
Natural Gas $58,962 8,076 MMBtu $7.30
TOTAL ENERGY COSTS $241,734
RECOMMENDED SAVINGS* $91,442 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$43,149
Cost:
$275,575
$38,708 354,465 $4,441 428 - - - - $38,708
354,465
kWh
$4,441
428
kW-months/year
-
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$14,551
Cost:
$7,200
$14,551 25,932 - - - - - - $14,551
25,932
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$11,286
Cost:
$5,605
$9,830 89,980 $1,456 141 - - - - $9,830
89,980
kWh
$1,456
141
kW-months/year
-
-
$
-
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$9,163
Cost:
$499
- - - - $9,163 - - - -
-
kWh
-
-
kW-months/year
$9,163
-
$
-
-
$
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$9,160
Cost:
$4,152
$8,071 73,908 $1,089 105 - - - - $8,071
73,908
kWh
$1,089
105
kW-months/year
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,346
Cost:
$1,441
$619 5,668 $77 7 - - $2,650 - $619
5,668
kWh
$77
7
kW-months/year
-
-
$
$2,650
-
$
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$787
Cost:
$3,178
$663 6,067 $124 12 - - - - $663
6,067
kWh
$124
12
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$91,442
Cost:
$297,650
$72,442 556,020 $7,187 693 $9,163 - $2,650 - $72,442
556,020
kWh
$7,187
693
kW-months/year
$9,163
-
$
$2,650
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost