IAC logo
IAC Assessment: AS0594
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0594
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2024
Principal Product delivery services
NAICS 492110 - Couriers and Express Delivery Services
SIC 4215 - Courier Services, Except By Air
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 120,000
Annual Production 5,000,000 Units
Production Hrs. Annual 5,012
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,373 831,480 kWh $0.09
Electricity Demand $9,711 1,912 kW-months/year $5.08
Electricity Fees $7,217 - $ -
Fuel Oil #1 $2,952,319 82,698 MMBtu $35.70
TOTAL ENERGY COSTS $3,045,620
RECOMMENDED SAVINGS* $559,287 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #1 Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #1 Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$534,062
Cost:
$3,480,000
$(-110,080) (-1,197,826) - - $644,142 18,043 - - $(-110,080)
(-1,197,826)
kWh
-
-
kW-months/year
$644,142
18,043
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,609
Cost:
$18,624
$18,521 201,532 $1,988 391 - - $100 - $18,521
201,532
kWh
$1,988
391
kW-months/year
-
-
MMBtu
$100
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,701
Cost:
$390
$3,701 40,268 - - - - - - $3,701
40,268
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7423 REDUCE HEAT GAIN BY WINDOW TINTING Savings:
$915
Cost:
$3,003
$915 9,953 - - - - - - $915
9,953
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$559,287
Cost:
$3,502,017
$(-86,943) (-946,073) $1,988 391 $644,142 18,043 $100 - $(-86,943)
(-946,073)
kWh
$1,988
391
kW-months/year
$644,142
18,043
MMBtu
$100
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #1 Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #1 Ancillary Material Cost