IAC Assessment: AS0595
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0595
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2024
Principal Product beer
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales <$500,000
# of Employees 6
Plant Area (Sq.Ft.) 20,070
Annual Production 4 Thousand Gallons
Production Hrs. Annual 2,794
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,056 498,720 kWh $0.09
Electricity Demand $6,424 1,284 kW-months/year $5.00
Electricity Fees $4,607 - $ -
LPG $48,625 1,519 MMBtu $32.01
Other Energy $3,063 1 MMBtu $3,063.00
TOTAL ENERGY COSTS $108,775
RECOMMENDED SAVINGS* $24,024 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$17,614
Cost:
$149,397
$16,552 134,497 $1,062 212 - - - - $16,552
134,497
kWh
$1,062
212
kW-months/year
-
-
$
-
-
$
02: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$3,901
Cost:
$142
- - - - - - $3,901 - -
-
kWh
-
-
kW-months/year
-
-
$
$3,901
-
$
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,366
Cost:
$166
$1,146 12,421 $220 44 - - - - $1,146
12,421
kWh
$220
44
kW-months/year
-
-
$
-
-
$
04: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$420
Cost:
$72
$376 4,078 $44 9 - - - - $376
4,078
kWh
$44
9
kW-months/year
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$336
Cost:
$44
$283 3,062 $53 11 - - - - $283
3,062
kWh
$53
11
kW-months/year
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$255
Cost:
$197
$80 868 $8 2 $167 - - - $80
868
kWh
$8
2
kW-months/year
$167
-
$
-
-
$
07: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$132
Cost:
$254
$132 1,417 - - - - - - $132
1,417
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$24,024
Cost:
$150,272
$18,569 156,343 $1,387 277 $167 - $3,901 - $18,569
156,343
kWh
$1,387
277
kW-months/year
$167
-
$
$3,901
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Ancillary Material Cost By-product Production