IAC logo
IAC Assessment: AS0598
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0598
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2024
Principal Product fleet vehicles
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 23,000
Annual Production 300 Units
Production Hrs. Annual 3,012
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,823 269,180 kWh $0.10
Electricity Demand $6,752 807 kW-months/year $8.37
Electricity Fees $1,872 - $ -
Natural Gas $15,601 957 MMBtu $16.30
Fuel Oil #1 $138,297 6,283 MMBtu $22.01
Fuel Oil #2 $153,803 7,961 MMBtu $19.32
Other Energy $2,229 1 MMBtu $2,229.00
TOTAL ENERGY COSTS $345,377
RECOMMENDED SAVINGS* $46,718 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$35,167
Cost:
$204,030
$35,906 360,501 $2,845 340 - - $(-3,584) - $35,906
360,501
kWh
$2,845
340
kW-months/year
-
-
MMBtu
$(-3,584)
-
$
02: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$5,201
Cost:
$936
- - - - $5,201 319 - - -
-
kWh
-
-
kW-months/year
$5,201
319
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,406
Cost:
$6,171
$3,956 39,719 - - - - $450 - $3,956
39,719
kWh
-
-
kW-months/year
-
-
MMBtu
$450
-
$
04: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,696
Cost:
$1,129
$938 9,421 $318 38 $440 27 - - $938
9,421
kWh
$318
38
kW-months/year
$440
27
MMBtu
-
-
$
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$248
Cost:
$144
$131 1,319 $117 14 - - - - $131
1,319
kWh
$117
14
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$46,718
Cost:
$212,410
$40,931 410,960 $3,280 392 $5,641 346 $(-3,134) - $40,931
410,960
kWh
$3,280
392
kW-months/year
$5,641
346
MMBtu
$(-3,134)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $