IAC logo
IAC Assessment: AS0610
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0610
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2025
Principal Product Assisted Living/Care
NAICS 623210 - Residential Intellectual and Developmental Disability Facilities
SIC 8361 - Residential Care
Sales <$500,000
# of Employees 71
Plant Area (Sq.Ft.) 98,000
Annual Production 1 Units
Production Hrs. Annual 2,133
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,166 993,907 kWh $0.13
Electricity Demand $36,336 2,940 kW-months/year $12.36
Electricity Fees $13,752 - $ -
Other Gas $26,099 869 MMBtu $30.03
TOTAL ENERGY COSTS $201,353
RECOMMENDED SAVINGS* $10,252 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Gas Administrative Changes Electricity Usage Electricity Demand Other Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$2,349
Cost:
$16,000
$1,611 12,793 $738 60 - - - - $1,611
12,793
kWh
$738
60
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,279
Cost:
$2,835
$1,992 15,818 $287 23 - - - - $1,992
15,818
kWh
$287
23
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$1,708
Cost:
$950
$(-390) (-3,096) $(-64) (-5) $2,162 72 - - $(-390)
(-3,096)
kWh
$(-64)
(-5)
kW-months/year
$2,162
72
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,539
Cost:
$1,975
$835 6,626 $453 37 - - $251 - $835
6,626
kWh
$453
37
kW-months/year
-
-
MMBtu
$251
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,308
Cost:
$61
$556 4,415 $299 24 - - $453 - $556
4,415
kWh
$299
24
kW-months/year
-
-
MMBtu
$453
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$893
Cost:
$510
$849 6,741 $44 4 - - - - $849
6,741
kWh
$44
4
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$176
Cost:
$187
$176 1,397 - - - - - - $176
1,397
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,252
Cost:
$22,518
$5,629 44,694 $1,757 142 $2,162 72 $704 - $5,629
44,694
kWh
$1,757
142
kW-months/year
$2,162
72
MMBtu
$704
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Other Gas Administrative Changes Electricity Usage Electricity Demand Other Gas Administrative Changes