Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2025 |
Principal Product | Assisted Living/Care |
NAICS | 623210 - Residential Intellectual and Developmental Disability Facilities |
SIC | 8361 - Residential Care |
Sales | <$500,000 |
# of Employees | 71 |
Plant Area (Sq.Ft.) | 98,000 |
Annual Production | 1 Units |
Production Hrs. Annual | 2,133 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $125,166 | 993,907 | kWh | $0.13 |
Electricity Demand | $36,336 | 2,940 | kW-months/year | $12.36 |
Electricity Fees | $13,752 | - | $ | - |
Other Gas | $26,099 | 869 | MMBtu | $30.03 |
TOTAL ENERGY COSTS | $201,353 | |||
RECOMMENDED SAVINGS* | $10,252 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Gas | Administrative Changes | Electricity Usage | Electricity Demand | Other Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE |
Savings: $2,349 Cost: $16,000 |
$1,611 | 12,793 | $738 | 60 | - | - | - | - |
$1,611 12,793 kWh |
$738 60 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,279 Cost: $2,835 |
$1,992 | 15,818 | $287 | 23 | - | - | - | - |
$1,992 15,818 kWh |
$287 23 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $1,708 Cost: $950 |
$(-390) | (-3,096) | $(-64) | (-5) | $2,162 | 72 | - | - |
$(-390) (-3,096) kWh |
$(-64) (-5) kW-months/year |
$2,162 72 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,539 Cost: $1,975 |
$835 | 6,626 | $453 | 37 | - | - | $251 | - |
$835 6,626 kWh |
$453 37 kW-months/year |
- - MMBtu |
$251 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $1,308 Cost: $61 |
$556 | 4,415 | $299 | 24 | - | - | $453 | - |
$556 4,415 kWh |
$299 24 kW-months/year |
- - MMBtu |
$453 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $893 Cost: $510 |
$849 | 6,741 | $44 | 4 | - | - | - | - |
$849 6,741 kWh |
$44 4 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $176 Cost: $187 |
$176 | 1,397 | - | - | - | - | - | - |
$176 1,397 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,252 Cost: $22,518 |
$5,629 | 44,694 | $1,757 | 142 | $2,162 | 72 | $704 | - | $5,629 44,694 kWh |
$1,757 142 kW-months/year |
$2,162 72 MMBtu |
$704 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Gas | Administrative Changes | Electricity Usage | Electricity Demand | Other Gas | Administrative Changes |