Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 1997 |
Principal Product | Oil Filter Components |
NAICS | n/a |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $5,000,000-$10,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 10,000,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $79,791 | 1,363,716 | kWh | $0.06 |
Electricity Demand | $11,833 | 4,643 | kW-months/year | $2.55 |
Electricity Fees | $108 | - | $ | - |
Natural Gas | $21,709 | 4,491 | MMBtu | $4.83 |
TOTAL ENERGY COSTS | $118,359 | |||
RECOMMENDED SAVINGS* | $40,984 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $30,183 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR |
Savings: $3,860 Cost: $5,500 |
- | - | - | - | $3,860 | 766 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,860 766 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $3,615 Cost: $1,250 |
- | - | - | - | $3,615 | 717 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,615 717 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,151 Cost: $1,151 |
$778 | 20,516 | $373 | 43 | - | - | - | - | - | - | - | - | - | - |
$778 20,516 kWh |
$373 43 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $867 Cost: $325 |
$544 | 14,361 | $323 | 37 | - | - | - | - | - | - | - | - | - | - |
$544 14,361 kWh |
$323 37 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $777 Cost: - |
$777 | 20,516 | - | - | - | - | - | - | - | - | - | - | - | - |
$777 20,516 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $668 Cost: $525 |
$487 | 12,896 | $181 | 21 | - | - | - | - | - | - | - | - | - | - |
$487 12,896 kWh |
$181 21 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $5,285 Cost: $4,500 |
$(-271) | (-7,034) | $(-215) | (-25) | - | - | $5,871 | 1,996,800 | - | - | $(-100) | - | - | - |
$(-271) (-7,034) kWh |
$(-215) (-25) kW-months/year |
- - MMBtu |
$5,871 1,996,800 Tgal |
- - lb |
$(-100) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $1,881 Cost: $500 |
- | - | - | - | - | - | - | - | $3,159 | 140,400 | $(-474) | - | $(-804) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$3,159 140,400 lb |
$(-474) - $ |
$(-804) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.452 ELIMINATE SHIFT |
Savings: $22,880 Cost: $2,500 |
- | - | - | - | - | - | - | - | - | - | $22,880 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$22,880 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $40,984 Cost: $16,251 |
$2,315 | 61,255 | $662 | 76 | $7,475 | 1,483 | $5,871 | 1,996,800 | $3,159 | 140,400 | $22,306 | - | $(-804) | - | $2,315 61,255 kWh |
$662 76 kW-months/year |
$7,475 1,483 MMBtu |
$5,871 1,996,800 Tgal |
$3,159 140,400 lb |
$22,306 - $ |
$(-804) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $30,183 Cost: $8,476 |
$1,051 | 27,843 | $481 | 55 | - | - | $5,871 | 1,996,800 | - | - | $22,780 | - | - | - | $1,051 27,843 kWh |
$481 55 kW-months/year |
- - MMBtu |
$5,871 1,996,800 Tgal |
- - lb |
$22,780 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes |