IAC Assessment: BD0097
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1997
Principal Product Fuses and Fuse Components
NAICS n/a
SIC 3613 - Switchgear And Switchboard Apparatus
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 25,000
Annual Production 38,000,000 Pieces
Production Hrs. Annual 4,680
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,613 1,109,320 kWh $0.03
Electricity Demand $37,865 3,249 kW-months/year $11.65
Electricity Fees $4,056 - $ -
Natural Gas $7,798 1,692 MMBtu $4.61
TOTAL ENERGY COSTS $90,078
RECOMMENDED SAVINGS* $588,998 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $545,409
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,363
Cost:
$700
- - - - $2,363 518 - - - - - - -
-
kWh
-
-
kW-months/year
$2,363
518
MMBtu
-
-
$
-
-
$
-
-
Tgal
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$996
Cost:
$300
$445 13,775 $551 47 - - - - - - - - $445
13,775
kWh
$551
47
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$993
Cost:
-
$993 31,067 - - - - - - - - - - $993
31,067
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$854
Cost:
$450
$854 26,671 - - - - - - - - - - $854
26,671
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
05: 3.4151 MINIMIZE WATER USAGE Savings:
$792
Cost:
$1,240
- - - - - - - - - - $792 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$792
-
Tgal
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$600
Cost:
$300
- - - - - - - - $600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$600
-
$
-
-
Tgal
07: 4.452 ELIMINATE SHIFT Savings:
$291,200
Cost:
$120,000
- - - - - - $291,200 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$291,200
-
$
-
-
$
-
-
Tgal
08: 4.452 ELIMINATE SHIFT Savings:
$249,600
Cost:
$120,000
- - - - - - $249,600 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$249,600
-
$
-
-
$
-
-
Tgal
09: 4.452 ELIMINATE SHIFT Savings:
$41,600
Cost:
$40,000
- - - - - - $41,600 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$41,600
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$588,998
Cost:
$282,990
$2,292 71,513 $551 47 $2,363 518 $582,400 - $600 - $792 - $2,292
71,513
kWh
$551
47
kW-months/year
$2,363
518
MMBtu
$582,400
-
$
$600
-
$
$792
-
Tgal
TOTAL IMPLEMENTED Savings:
$545,409
Cost:
$242,690
$854 26,671 - - $2,363 518 $540,800 - $600 - $792 - $854
26,671
kWh
-
-
kW-months/year
$2,363
518
MMBtu
$540,800
-
$
$600
-
$
$792
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Water Consumption