Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1998
Principal Product transmitters
NAICS n/a
SIC 3663 - Radio & Tv Communications Equipment
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 155,000
Annual Production 25,000 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $167,665 5,107,269 kWh $0.03
Electricity Demand $96,785 9,156 kW-months/year $10.57
Electricity Fees $566 - $ -
Natural Gas $5,131 976 MMBtu $5.26
TOTAL ENERGY COSTS $297,961
RECOMMENDED SAVINGS* $699,627 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,521
Cost:
-
$180 5,569 $1,341 127 - - - - $180
5,569
kWh
$1,341
127
kW-months/year
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,411
Cost:
$400
$840 25,498 $571 54 - - - - $840
25,498
kWh
$571
54
kW-months/year
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$474
Cost:
$800
$181 5,569 $293 28 - - - - $181
5,569
kWh
$293
28
kW-months/year
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$462
Cost:
-
$462 14,068 - - - - - - $462
14,068
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$708
Cost:
$300
$252 7,620 $456 19 - - - - $252
7,620
kWh
$456
19
kW-months/year
-
-
$
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$21,040
Cost:
$7,500
- - - - - - $21,040 - -
-
kWh
-
-
kW-months/year
-
-
$
$21,040
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$8,411
Cost:
-
- - - - - - $8,411 - -
-
kWh
-
-
kW-months/year
-
-
$
$8,411
-
$
08: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$665,600
Cost:
$150,000
- - - - $665,600 - - - -
-
kWh
-
-
kW-months/year
$665,600
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$699,627
Cost:
$159,000
$1,915 58,324 $2,661 228 $665,600 - $29,451 - $1,915
58,324
kWh
$2,661
228
kW-months/year
$665,600
-
$
$29,451
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost