IAC logo
IAC Assessment: BD0136
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0136
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1999
Principal Product Vinyl Framed Windows
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 40,000
Annual Production 52,000 Pieces
Production Hrs. Annual 2,600
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,568 608,148 kWh $0.05
Electricity Demand $5,328 2,187 kW-months/year $2.44
Electricity Fees $6,736 - $ -
Natural Gas $3,571 825 MMBtu $4.33
TOTAL ENERGY COSTS $46,054
RECOMMENDED SAVINGS* $14,176 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$703
Cost:
$500
- - - - $703 180 - - - - -
-
kWh
-
-
kW-months/year
$703
180
MMBtu
-
-
lb
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$564
Cost:
$600
$408 8,792 $156 64 - - - - - - $408
8,792
kWh
$156
64
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$339
Cost:
$300
$273 5,862 $66 27 - - - - - - $273
5,862
kWh
$66
27
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$249
Cost:
$800
$200 4,396 $49 20 - - - - - - $200
4,396
kWh
$49
20
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$200
Cost:
$350
$161 3,517 $39 16 - - - - - - $161
3,517
kWh
$39
16
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$2,290
Cost:
$9,000
- - - - - - $2,290 312,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,290
312,000
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$7,800
Cost:
$7,800
- - - - - - $7,800 28,400 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,800
28,400
lb
-
-
$
08: 4.446 AUTOMATE FINISHING PROCESS Savings:
$2,031
Cost:
$7,450
- - - - - - - - $2,031 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$2,031
-
$
TOTAL RECOMMENDED Savings:
$14,176
Cost:
$26,800
$1,042 22,567 $310 127 $703 180 $10,090 340,400 $2,031 - $1,042
22,567
kWh
$310
127
kW-months/year
$703
180
MMBtu
$10,090
340,400
lb
$2,031
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes