IAC logo
IAC Assessment: BD0154
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0154
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2000
Principal Product Roof bolts and Plates
NAICS n/a
SIC 2439 - Structural Wood Members, Nec
Sales n/a
# of Employees 100
Plant Area (Sq.Ft.) 60,000
Annual Production 800,000 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,698 1,917,351 kWh $0.03
Electricity Demand $74,488 6,457 kW-months/year $11.54
Electricity Fees $1,495 - $ -
Natural Gas $214,342 32,556 MMBtu $6.58
TOTAL ENERGY COSTS $360,535
RECOMMENDED SAVINGS* $28,818 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,670
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,576
Cost:
$1,000
$3,362 99,648 $2,214 192 - - - - $3,362
99,648
kWh
$2,214
192
kW-months/year
-
-
lb
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,094
Cost:
$1,000
$4,094 364,596 - - - - - - $4,094
364,596
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,375
Cost:
$260
$827 24,619 $548 48 - - - - $827
24,619
kWh
$548
48
kW-months/year
-
-
lb
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,042
Cost:
$600
$613 18,171 $429 37 - - - - $613
18,171
kWh
$429
37
kW-months/year
-
-
lb
-
-
$
05: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$9,000
Cost:
$1,000
- - - - $9,000 - - - -
-
kWh
-
-
kW-months/year
$9,000
-
lb
-
-
$
06: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$7,201
Cost:
$4,500
- - - - - - $7,201 - -
-
kWh
-
-
kW-months/year
-
-
lb
$7,201
-
$
07: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$530
Cost:
-
- - - - - - $530 - -
-
kWh
-
-
kW-months/year
-
-
lb
$530
-
$
TOTAL RECOMMENDED Savings:
$28,818
Cost:
$8,360
$8,896 507,034 $3,191 277 $9,000 - $7,731 - $8,896
507,034
kWh
$3,191
277
kW-months/year
$9,000
-
lb
$7,731
-
$
TOTAL IMPLEMENTED Savings:
$18,670
Cost:
$3,000
$7,456 464,244 $2,214 192 $9,000 - - - $7,456
464,244
kWh
$2,214
192
kW-months/year
$9,000
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $