IAC Assessment: BD0157
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0157
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2000
Principal Product Aluminium Castings
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 42,688
Annual Production 2,800,000 Pounds
Production Hrs. Annual 4,680
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $202,504 3,643,611 kWh $0.06
Electricity Demand $2,639 1,411 kW-months/year $1.87
Electricity Fees $473 - $ -
Natural Gas $74,343 16,391 MMBtu $4.54
TOTAL ENERGY COSTS $281,420
RECOMMENDED SAVINGS* $41,331 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,584
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product
$ kWh $ MMBtu $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$3,147
Cost:
$2,325
$2,481 44,842 $666 156 - - $2,481
44,842
kWh
$666
156
MMBtu
-
-
$
02: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$2,952
Cost:
$4,600
$2,952 109,613 - - - - $2,952
109,613
kWh
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,314
Cost:
$825
$1,314 20,516 - - - - $1,314
20,516
kWh
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$507
Cost:
$1,500
- - $507 119 - - -
-
kWh
$507
119
MMBtu
-
-
$
05: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$19,669
Cost:
$800
- - - - $19,669 - -
-
kWh
-
-
MMBtu
$19,669
-
$
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$9,601
Cost:
$11,200
- - - - $9,601 - -
-
kWh
-
-
MMBtu
$9,601
-
$
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$4,141
Cost:
$3,250
- - - - $4,141 - -
-
kWh
-
-
MMBtu
$4,141
-
$
TOTAL RECOMMENDED Savings:
$41,331
Cost:
$24,500
$6,747 174,971 $1,173 275 $33,411 - $6,747
174,971
kWh
$1,173
275
MMBtu
$33,411
-
$
TOTAL IMPLEMENTED Savings:
$30,584
Cost:
$12,825
$1,314 20,516 - - $29,270 - $1,314
20,516
kWh
-
-
MMBtu
$29,270
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product