Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2000 |
Principal Product | Telecommunication Products |
NAICS | n/a |
SIC | 3679 - Electronic Components, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 56,750 |
Annual Production | 325,000 Pieces |
Production Hrs. Annual | 5,460 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $180,349 | 2,319,461 | kWh | $0.08 |
Natural Gas | $6,157 | 1,100 | MMBtu | $5.60 |
TOTAL ENERGY COSTS | $190,622 | |||
RECOMMENDED SAVINGS* | $2,355,525 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,339,803 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Increase in Production | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $4,409 Cost: $975 |
$4,409 | 56,565 | - | - | - | - | - | - | - | - |
$4,409 56,565 kWh |
- - MMBtu |
- - lb |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,060 Cost: $2,500 |
- | - | $3,060 | 134 | - | - | - | - | - | - |
- - kWh |
$3,060 134 MMBtu |
- - lb |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $644 Cost: $600 |
$644 | 8,206 | - | - | - | - | - | - | - | - |
$644 8,206 kWh |
- - MMBtu |
- - lb |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $466 Cost: - |
$466 | 5,862 | - | - | - | - | - | - | - | - |
$466 5,862 kWh |
- - MMBtu |
- - lb |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $600 Cost: $500 |
- | - | - | - | $600 | 12,000 | - | - | - | - |
- - kWh |
- - MMBtu |
$600 12,000 lb |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $593 Cost: $1,500 |
- | - | - | - | $593 | 11,000 | - | - | - | - |
- - kWh |
- - MMBtu |
$593 11,000 lb |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $2,334,150 Cost: $189,000 |
- | - | - | - | - | - | - | - | $2,334,150 | - |
- - kWh |
- - MMBtu |
- - lb |
- - $ |
$2,334,150 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $6,116 Cost: $800 |
- | - | - | - | - | - | $6,116 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$6,116 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $5,487 Cost: $10,100 |
- | - | - | - | - | - | $5,487 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$5,487 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $2,355,525 Cost: $205,975 |
$5,519 | 70,633 | $3,060 | 134 | $1,193 | 23,000 | $11,603 | - | $2,334,150 | - | $5,519 70,633 kWh |
$3,060 134 MMBtu |
$1,193 23,000 lb |
$11,603 - $ |
$2,334,150 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,339,803 Cost: $191,075 |
$5,053 | 64,771 | - | - | $600 | 12,000 | - | - | $2,334,150 | - | $5,053 64,771 kWh |
- - MMBtu |
$600 12,000 lb |
- - $ |
$2,334,150 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Increase in Production | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Increase in Production |