IAC logo
IAC Assessment: BD0163
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0163
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2000
Principal Product Sodium Gluconate
NAICS n/a
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 43
Plant Area (Sq.Ft.) 185,400
Annual Production 30,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $212,429 7,041,032 kWh $0.03
Electricity Demand $119,620 8,202 kW-months/year $14.58
Electricity Fees $13,183 - $ -
Natural Gas $373,388 121,054 MMBtu $3.08
TOTAL ENERGY COSTS $850,319
RECOMMENDED SAVINGS* $48,954 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,825
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,931
Cost:
$10,000
- - - - $13,931 4,913 - - - - -
-
kWh
-
-
kW-months/year
$13,931
4,913
MMBtu
-
-
lb
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$9,099
Cost:
$5,000
- - - - $9,099 3,150 - - - - -
-
kWh
-
-
kW-months/year
$9,099
3,150
MMBtu
-
-
lb
-
-
$
03: 2.1222 INSTALL TURBULATORS Savings:
$8,505
Cost:
$1,000
- - - - $8,505 2,944 - - - - -
-
kWh
-
-
kW-months/year
$8,505
2,944
MMBtu
-
-
lb
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$8,256
Cost:
$8,000
$4,970 164,713 $3,286 225 - - - - - - $4,970
164,713
kWh
$3,286
225
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,058
Cost:
$8,000
- - - - - - $2,058 19 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,058
19
lb
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$280
Cost:
$600
- - - - - - $280 300 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$280
300
lb
-
-
$
07: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$6,825
Cost:
$20,000
- - - - - - - - $6,825 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$6,825
-
$
TOTAL RECOMMENDED Savings:
$48,954
Cost:
$52,600
$4,970 164,713 $3,286 225 $31,535 11,007 $2,338 319 $6,825 - $4,970
164,713
kWh
$3,286
225
kW-months/year
$31,535
11,007
MMBtu
$2,338
319
lb
$6,825
-
$
TOTAL IMPLEMENTED Savings:
$6,825
Cost:
$20,000
- - - - - - - - $6,825 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$6,825
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes