Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2000 |
Principal Product | Specialty Chemicals |
NAICS | n/a |
SIC | 2819 - Industrial Inorganic Chemicals, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 135,000 |
Annual Production | 210,500,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $314,854 | 10,930,539 | kWh | $0.03 |
Electricity Demand | $163,076 | 17,471 | kW-months/year | $9.33 |
Electricity Fees | $(-3,678) | - | $ | - |
Natural Gas | $40,337 | 8,664 | MMBtu | $4.66 |
TOTAL ENERGY COSTS | $739,735 | |||
RECOMMENDED SAVINGS* | $430,788 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,989 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | One-time Revenue or Avoided Cost | Primary Product | Increase in Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | One-time Revenue or Avoided Cost | Primary Product | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,357 Cost: $2,000 |
$1,695 | 63,013 | $662 | 86 | - | - | - | - | - | - | - | - | - | - |
$1,695 63,013 kWh |
$662 86 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,182 Cost: $2,700 |
$1,192 | 41,325 | $990 | 106 | - | - | - | - | - | - | - | - | - | - |
$1,192 41,325 kWh |
$990 106 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,263 Cost: - |
$875 | 30,481 | $388 | 42 | - | - | - | - | - | - | - | - | - | - |
$875 30,481 kWh |
$388 42 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $823 Cost: $500 |
$569 | 19,637 | $254 | 27 | - | - | - | - | - | - | - | - | - | - |
$569 19,637 kWh |
$254 27 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $594 Cost: $1,000 |
$411 | 14,361 | $183 | 20 | - | - | - | - | - | - | - | - | - | - |
$411 14,361 kWh |
$183 20 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) |
Savings: $380,939 Cost: $600,000 |
- | - | - | - | - | - | $380,939 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$380,939 - $ |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL |
Savings: $33,228 Cost: $35,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $33,228 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
$33,228 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $6,646 Cost: $2,000 |
- | - | - | - | - | - | - | - | - | - | $6,646 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
$6,646 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $1,759 Cost: $6,500 |
- | - | - | - | $1,759 | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,759 - lb |
- - $ |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $997 Cost: $600 |
- | - | - | - | - | - | - | - | $997 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$997 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $430,788 Cost: $650,300 |
$4,742 | 168,817 | $2,477 | 281 | $1,759 | - | $380,939 | - | $997 | - | $6,646 | - | $33,228 | - | $4,742 168,817 kWh |
$2,477 281 kW-months/year |
$1,759 - lb |
$380,939 - $ |
$997 - $ |
$6,646 - $ |
$33,228 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,989 Cost: $45,300 |
$1,761 | 60,962 | $1,244 | 133 | $1,759 | - | - | - | $997 | - | - | - | $33,228 | - | $1,761 60,962 kWh |
$1,244 133 kW-months/year |
$1,759 - lb |
- - $ |
$997 - $ |
- - $ |
$33,228 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | One-time Revenue or Avoided Cost | Primary Product | Increase in Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Administrative Changes | One-time Revenue or Avoided Cost | Primary Product | Increase in Production |