IAC logo
IAC Assessment: BD0217
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0217
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2002
Principal Product Modular Homes
NAICS n/a
SIC 3219 -
Sales $5,000,000-$10,000,000
# of Employees 66
Plant Area (Sq.Ft.) 54,000
Annual Production 250 Pieces
Production Hrs. Annual 2,080
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,275 333,853 kWh $0.07
Electricity Demand $3,668 1,465 kW-months/year $2.50
Natural Gas $17,155 17,050 MMBtu $1.01
TOTAL ENERGY COSTS $45,683
RECOMMENDED SAVINGS* $20,131 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,929
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$3,511
Cost:
$8,000
- - - - $3,511 347 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,511
347
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,250
Cost:
$1,500
- - - - $1,250 123 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,250
123
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$452
Cost:
$1,000
- - $370 63 - - - - $33 - $49 - - - -
-
kWh
$370
63
kW-months/year
-
-
MMBtu
-
-
Tgal
$33
-
$
$49
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$345
Cost:
$700
$251 22 $94 37 - - - - - - - - - - $251
22
kWh
$94
37
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$104
Cost:
-
$76 7 $28 11 - - - - - - - - - - $76
7
kWh
$28
11
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$334
Cost:
$200
- - - - - - $334 36,400 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$334
36,400
Tgal
-
-
$
-
-
$
-
-
$
07: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$7,522
Cost:
$2,000
- - - - - - - - - - $7,522 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$7,522
-
$
-
-
$
08: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$3,668
Cost:
$4,000
- - $3,668 1,465 - - - - - - - - - - -
-
kWh
$3,668
1,465
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
09: 4.447 AUTOMATE PAYROLL SYSTEM Savings:
$2,945
Cost:
$2,495
- - - - - - - - - - - - $2,945 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
$2,945
-
$
TOTAL RECOMMENDED Savings:
$20,131
Cost:
$19,895
$327 29 $4,160 1,576 $4,761 470 $334 36,400 $33 - $7,571 - $2,945 - $327
29
kWh
$4,160
1,576
kW-months/year
$4,761
470
MMBtu
$334
36,400
Tgal
$33
-
$
$7,571
-
$
$2,945
-
$
TOTAL IMPLEMENTED Savings:
$1,929
Cost:
$2,400
$251 22 $94 37 $1,250 123 $334 36,400 - - - - - - $251
22
kWh
$94
37
kW-months/year
$1,250
123
MMBtu
$334
36,400
Tgal
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost