Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2004 |
Principal Product | Tractor Frames and Assorted Components |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 702 |
Plant Area (Sq.Ft.) | 270,000 |
Annual Production | 4,619,925 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $300,099 | 10,763,924 | kWh | $0.03 |
Electricity Demand | $194,457 | 21,820 | kW-months/year | $8.91 |
Electricity Fees | $19,263 | - | $ | - |
Natural Gas | $223,501 | 32,150 | MMBtu | $6.95 |
TOTAL ENERGY COSTS | $786,942 | |||
RECOMMENDED SAVINGS* | $339,453 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $290,570 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $42,617 Cost: $1,000 |
- | - | - | - | $42,617 | 6,132 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$42,617 6,132 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $22,780 Cost: $43,400 |
- | - | - | - | $22,780 | 3,308 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$22,780 3,308 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $18,914 Cost: $1,000 |
- | - | - | - | $18,914 | 2,721 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$18,914 2,721 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $13,459 Cost: $1,260 |
- | - | - | - | $13,459 | 1,937 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$13,459 1,937 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,568 Cost: $4,325 |
$5,265 | 188,697 | $2,303 | 259 | - | - | - | - | - | - | - | - | - | - | - | - |
$5,265 188,697 kWh |
$2,303 259 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $5,880 Cost: $20,000 |
- | - | - | - | $1,966 | 286 | - | - | - | - | $3,914 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,966 286 MMBtu |
- - Tgal |
- - lb |
$3,914 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,875 Cost: $1,700 |
$4,086 | 146,499 | $1,789 | 201 | - | - | - | - | - | - | - | - | - | - | - | - |
$4,086 146,499 kWh |
$1,789 201 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $3,196 Cost: $2,500 |
$978 | 35,040 | $642 | 72 | - | - | - | - | - | - | $87 | - | - | - | $1,489 | - |
$978 35,040 kWh |
$642 72 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$87 - $ |
- - $ |
$1,489 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $1,383 Cost: $1,520 |
$371 | 12,658 | - | - | $1,012 | 146 | - | - | - | - | - | - | - | - | - | - |
$371 12,658 kWh |
- - kW-months/year |
$1,012 146 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $784 Cost: $1,500 |
$199 | 7,170 | $585 | 66 | - | - | - | - | - | - | - | - | - | - | - | - |
$199 7,170 kWh |
$585 66 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $448 Cost: $650 |
- | - | - | - | $448 | 65 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$448 65 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $36,771 Cost: $7,140 |
- | - | - | - | - | - | - | - | $36,771 | 42,000 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$36,771 42,000 lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $16,640 Cost: $140 |
- | - | - | - | - | - | - | - | $16,640 | 40,800 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$16,640 40,800 lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $14,414 Cost: $590 |
- | - | - | - | - | - | $14,414 | 3,276,000 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$14,414 3,276,000 Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD |
Savings: $11,370 Cost: $9,000 |
- | - | - | - | - | - | - | - | $11,370 | 20,400 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$11,370 20,400 lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 4.422 UTILIZE OUTSIDE CONTRACTING |
Savings: $57,614 Cost: $200 |
- | - | - | - | - | - | - | - | - | - | - | - | $57,614 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
$57,614 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $59,000 Cost: $15,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $59,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
$59,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $20,740 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | $20,740 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
$20,740 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $339,453 Cost: $110,925 |
$10,899 | 390,064 | $5,319 | 597 | $101,196 | 14,594 | $14,414 | 3,276,000 | $64,781 | 103,200 | $4,001 | - | $137,354 | - | $1,489 | - | $10,899 390,064 kWh |
$5,319 597 kW-months/year |
$101,196 14,594 MMBtu |
$14,414 3,276,000 Tgal |
$64,781 103,200 lb |
$4,001 - $ |
$137,354 - $ |
$1,489 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $290,570 Cost: $62,005 |
$9,351 | 335,196 | $4,092 | 459 | $77,404 | 11,140 | $14,414 | 3,276,000 | $64,781 | 103,200 | $3,914 | - | $116,614 | - | - | - | $9,351 335,196 kWh |
$4,092 459 kW-months/year |
$77,404 11,140 MMBtu |
$14,414 3,276,000 Tgal |
$64,781 103,200 lb |
$3,914 - $ |
$116,614 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost |