IAC Assessment: BD0272
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0272
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2004
Principal Product Tractor Frames and Assorted Components
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 702
Plant Area (Sq.Ft.) 270,000
Annual Production 4,619,925 Pieces
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $300,099 10,763,924 kWh $0.03
Electricity Demand $194,457 21,820 kW-months/year $8.91
Electricity Fees $19,263 - $ -
Natural Gas $223,501 32,150 MMBtu $6.95
TOTAL ENERGY COSTS $786,942
RECOMMENDED SAVINGS* $339,453 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $290,570
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$42,617
Cost:
$1,000
- - - - $42,617 6,132 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$42,617
6,132
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$22,780
Cost:
$43,400
- - - - $22,780 3,308 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$22,780
3,308
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$18,914
Cost:
$1,000
- - - - $18,914 2,721 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$18,914
2,721
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$13,459
Cost:
$1,260
- - - - $13,459 1,937 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$13,459
1,937
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,568
Cost:
$4,325
$5,265 188,697 $2,303 259 - - - - - - - - - - - - $5,265
188,697
kWh
$2,303
259
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$5,880
Cost:
$20,000
- - - - $1,966 286 - - - - $3,914 - - - - - -
-
kWh
-
-
kW-months/year
$1,966
286
MMBtu
-
-
Tgal
-
-
lb
$3,914
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,875
Cost:
$1,700
$4,086 146,499 $1,789 201 - - - - - - - - - - - - $4,086
146,499
kWh
$1,789
201
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,196
Cost:
$2,500
$978 35,040 $642 72 - - - - - - $87 - - - $1,489 - $978
35,040
kWh
$642
72
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$87
-
$
-
-
$
$1,489
-
$
09: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$1,383
Cost:
$1,520
$371 12,658 - - $1,012 146 - - - - - - - - - - $371
12,658
kWh
-
-
kW-months/year
$1,012
146
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$784
Cost:
$1,500
$199 7,170 $585 66 - - - - - - - - - - - - $199
7,170
kWh
$585
66
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
11: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$448
Cost:
$650
- - - - $448 65 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$448
65
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
12: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$36,771
Cost:
$7,140
- - - - - - - - $36,771 42,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$36,771
42,000
lb
-
-
$
-
-
$
-
-
$
13: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$16,640
Cost:
$140
- - - - - - - - $16,640 40,800 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$16,640
40,800
lb
-
-
$
-
-
$
-
-
$
14: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$14,414
Cost:
$590
- - - - - - $14,414 3,276,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,414
3,276,000
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
15: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD Savings:
$11,370
Cost:
$9,000
- - - - - - - - $11,370 20,400 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$11,370
20,400
lb
-
-
$
-
-
$
-
-
$
16: 4.422 UTILIZE OUTSIDE CONTRACTING Savings:
$57,614
Cost:
$200
- - - - - - - - - - - - $57,614 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$57,614
-
$
-
-
$
17: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$59,000
Cost:
$15,000
- - - - - - - - - - - - $59,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$59,000
-
$
-
-
$
18: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$20,740
Cost:
-
- - - - - - - - - - - - $20,740 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$20,740
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$339,453
Cost:
$110,925
$10,899 390,064 $5,319 597 $101,196 14,594 $14,414 3,276,000 $64,781 103,200 $4,001 - $137,354 - $1,489 - $10,899
390,064
kWh
$5,319
597
kW-months/year
$101,196
14,594
MMBtu
$14,414
3,276,000
Tgal
$64,781
103,200
lb
$4,001
-
$
$137,354
-
$
$1,489
-
$
TOTAL IMPLEMENTED Savings:
$290,570
Cost:
$62,005
$9,351 335,196 $4,092 459 $77,404 11,140 $14,414 3,276,000 $64,781 103,200 $3,914 - $116,614 - - - $9,351
335,196
kWh
$4,092
459
kW-months/year
$77,404
11,140
MMBtu
$14,414
3,276,000
Tgal
$64,781
103,200
lb
$3,914
-
$
$116,614
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost