IAC logo
IAC Assessment: BD0318
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0318
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2007
Principal Product Library Bound Books
NAICS 323120 - Support Activities for Printing
SIC 2789 - Bookbinding And Related Work
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 110,000
Annual Production 2,500,000 Units
Production Hrs. Annual 4,125
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,487 1,496,186 kWh $0.06
Electricity Demand $35,014 4,595 kW-months/year $7.62
Natural Gas $9,258 762 MMBtu $12.15
TOTAL ENERGY COSTS $127,759
RECOMMENDED SAVINGS* $34,272 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,077
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 4.4470 AUTOMATE PAYROLL SYSTEM Savings:
$15,000
Cost:
$10,500
- - - - - - - - $15,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$15,000
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$10,326
Cost:
$1,140
$6,835 122,501 $2,713 356 - - $123 - - - $655 - $6,835
122,501
kWh
$2,713
356
kW-months/year
-
-
MMBtu
$123
-
$
-
-
$
$655
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$304
Cost:
$675
$193 3,454 $111 15 - - - - - - - - $193
3,454
kWh
$111
15
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,945
Cost:
$1,200
- - - - $6,945 553 - - - - - - -
-
kWh
-
-
kW-months/year
$6,945
553
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,077
Cost:
$1,077
$689 12,343 $388 51 - - - - - - - - $689
12,343
kWh
$388
51
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$301
Cost:
$600
$195 3,492 $106 14 - - - - - - - - $195
3,492
kWh
$106
14
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$319
Cost:
$480
- - - - $319 26 - - - - - - -
-
kWh
-
-
kW-months/year
$319
26
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$34,272
Cost:
$15,672
$7,912 141,790 $3,318 436 $7,264 579 $123 - $15,000 - $655 - $7,912
141,790
kWh
$3,318
436
kW-months/year
$7,264
579
MMBtu
$123
-
$
$15,000
-
$
$655
-
$
TOTAL IMPLEMENTED Savings:
$1,077
Cost:
$1,077
$689 12,343 $388 51 - - - - - - - - $689
12,343
kWh
$388
51
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost