Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2007
Principal Product Generator Sets
NAICS 335931 - Current-Carrying Wiring Device Manufacturing
SIC 3643 - Current-carrying Wiring Devices
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 100,000
Annual Production 1,200 Units
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,918 1,454,074 kWh $0.05
Electricity Demand $7,440 3,162 kW-months/year $2.35
Electricity Fees $6,305 - $ -
Natural Gas $54,054 4,616 MMBtu $11.71
TOTAL ENERGY COSTS $139,717
RECOMMENDED SAVINGS* $40,770 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,888
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$32,663
Cost:
$120,000
- - - - $10,163 1,320 $22,500 - - - -
-
kWh
-
-
kW-months/year
$10,163
1,320
MMBtu
$22,500
-
$
-
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$5,141
Cost:
$2,400
- - - - $5,141 668 - - - - -
-
kWh
-
-
kW-months/year
$5,141
668
MMBtu
-
-
$
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$2,096
Cost:
$10,000
$1,310 28,476 $710 302 - - $22 - $54 - $1,310
28,476
kWh
$710
302
kW-months/year
-
-
MMBtu
$22
-
$
$54
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$534
Cost:
$525
$415 79,289 $119 142 - - - - - - $415
79,289
kWh
$119
142
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$225
Cost:
-
$207 4,089 $18 8 - - - - - - $207
4,089
kWh
$18
8
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$111
Cost:
$150
$102 2,011 $9 4 - - - - - - $102
2,011
kWh
$9
4
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$40,770
Cost:
$133,075
$2,034 113,865 $856 456 $15,304 1,988 $22,522 - $54 - $2,034
113,865
kWh
$856
456
kW-months/year
$15,304
1,988
MMBtu
$22,522
-
$
$54
-
$
TOTAL IMPLEMENTED Savings:
$32,888
Cost:
$120,000
$207 4,089 $18 8 $10,163 1,320 $22,500 - - - $207
4,089
kWh
$18
8
kW-months/year
$10,163
1,320
MMBtu
$22,500
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost