Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2012 |
Principal Product | Fuel and hydraulic spin-on filters |
NAICS | 336390 - Other Motor Vehicle Parts Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $10,000,000-$50,000,000 |
# of Employees | 103 |
Plant Area (Sq.Ft.) | 61,500 |
Annual Production | 2,500,000 Pieces |
Production Hrs. Annual | 2,704 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $108,113 | 1,646,525 | kWh | $0.07 |
Electricity Demand | $36,344 | 6,999 | kW-months/year | $5.19 |
Electricity Fees | $8,966 | - | $ | - |
Natural Gas | $54,938 | 7,550 | MMBtu | $7.28 |
TOTAL ENERGY COSTS | $208,361 | |||
RECOMMENDED SAVINGS* | $47,001 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,688 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $23,702 Cost: $57,000 |
$27,366 | 416,520 | $9,977 | 1,922 | $(-13,641) | (-2,165) | - | - |
$27,366 416,520 kWh |
$9,977 1,922 kW-months/year |
$(-13,641) (-2,165) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $15,937 Cost: $1,500 |
$11,679 | 177,764 | $4,258 | 821 | - | - | - | - |
$11,679 177,764 kWh |
$4,258 821 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,611 Cost: $50 |
$3,445 | 52,433 | $1,166 | 225 | - | - | - | - |
$3,445 52,433 kWh |
$1,166 225 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,622 Cost: $4,000 |
- | - | - | - | $1,622 | 223 | - | - |
- - kWh |
- - kW-months/year |
$1,622 223 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $154 Cost: $20 |
$124 | 1,331 | $30 | 6 | - | - | - | - |
$124 1,331 kWh |
$30 6 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $975 Cost: $400 |
- | - | - | - | - | - | $975 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$975 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,001 Cost: $62,970 |
$42,614 | 648,048 | $15,431 | 2,974 | $(-12,019) | (-1,942) | $975 | - | $42,614 648,048 kWh |
$15,431 2,974 kW-months/year |
$(-12,019) (-1,942) MMBtu |
$975 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,688 Cost: $5,920 |
$11,803 | 179,095 | $4,288 | 827 | $1,622 | 223 | $975 | - | $11,803 179,095 kWh |
$4,288 827 kW-months/year |
$1,622 223 MMBtu |
$975 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material |