IAC logo
IAC Assessment: BS0003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2012
Principal Product Manufactured homes
NAICS 321991 - Manufactured Home (Mobile Home) Manufacturing
SIC 2452 - Prefabricated Wood Buildings
Sales $10,000,000-$50,000,000
# of Employees 71
Plant Area (Sq.Ft.) 146,600
Annual Production 590 Pieces
Production Hrs. Annual 2,024
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,251 905,844 kWh $0.03
Electricity Demand $17,602 4,183 kW-months/year $4.21
Electricity Fees $21,490 - $ -
Natural Gas $65,565 9,312 MMBtu $7.04
TOTAL ENERGY COSTS $132,909
RECOMMENDED SAVINGS* $32,694 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,791
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,118
Cost:
$296
$1,040 31,720 $1,078 188 - - - - $1,040
31,720
kWh
$1,078
188
kW-months/year
-
-
MMBtu
-
-
$
02: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$1,528
Cost:
$300
$1,253 38,256 $1,301 227 - - $(-1,026) - $1,253
38,256
kWh
$1,301
227
kW-months/year
-
-
MMBtu
$(-1,026)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,856
Cost:
$4,997
$2,384 72,783 $2,473 432 - - - - $2,384
72,783
kWh
$2,473
432
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$831
Cost:
$1,497
$408 12,462 $423 74 - - - - $408
12,462
kWh
$423
74
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$458
Cost:
$600
$225 6,861 $233 41 - - - - $225
6,861
kWh
$233
41
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,478
Cost:
$500
$(-319) (-9,756) $(-26) (-5) $1,823 259 - - $(-319)
(-9,756)
kWh
$(-26)
(-5)
kW-months/year
$1,823
259
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$10,488
Cost:
$570
- - - - $10,488 1,491 - - -
-
kWh
-
-
kW-months/year
$10,488
1,491
MMBtu
-
-
$
08: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$10,937
Cost:
$39,850
- - - - $10,937 1,555 - - -
-
kWh
-
-
kW-months/year
$10,937
1,555
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,694
Cost:
$48,610
$4,990 152,326 $5,482 957 $23,248 3,305 $(-1,026) - $4,990
152,326
kWh
$5,482
957
kW-months/year
$23,248
3,305
MMBtu
$(-1,026)
-
$
TOTAL IMPLEMENTED Savings:
$9,791
Cost:
$7,690
$5,309 162,082 $5,508 962 - - $(-1,026) - $5,309
162,082
kWh
$5,508
962
kW-months/year
-
-
MMBtu
$(-1,026)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $