IAC logo
IAC Assessment: BS0009
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0009
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2013
Principal Product Milk, Sour Cream, Cottage Cheese
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $50,000,000-$100,000,000
# of Employees 130
Plant Area (Sq.Ft.) 100,000
Annual Production 39,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $377,051 12,815,595 kWh $0.03
Electricity Demand $108,161 25,023 kW-months/year $4.32
Electricity Fees $77,479 - $ -
Natural Gas $967,680 131,248 MMBtu $7.37
TOTAL ENERGY COSTS $1,530,371
RECOMMENDED SAVINGS* $772,484 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,127
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas By-product Production Electricity Usage Electricity Demand Natural Gas By-product Production
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,591
Cost:
$260
$1,591 51,415 - - - - - - $1,591
51,415
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,495
Cost:
$1,840
$1,495 48,320 - - - - - - $1,495
48,320
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,533
Cost:
$2,806
$(-59) (-1,921) - - $1,592 220 - - $(-59)
(-1,921)
kWh
-
-
kW-months/year
$1,592
220
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,077
Cost:
$689
$1,647 53,220 $430 73 - - - - $1,647
53,220
kWh
$430
73
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,037
Cost:
$126
$2,037 65,843 - - - - - - $2,037
65,843
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,422
Cost:
$3,959
- - - - $5,422 749 - - -
-
kWh
-
-
kW-months/year
$5,422
749
MMBtu
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,187
Cost:
$1,066
- - - - $3,187 440 - - -
-
kWh
-
-
kW-months/year
$3,187
440
MMBtu
-
-
$
08: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$11,756
Cost:
$210
$11,756 379,946 - - - - - - $11,756
379,946
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$743,387
Cost:
$1,700,000
- - - - - - $743,387 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$743,387
-
$
TOTAL RECOMMENDED Savings:
$772,484
Cost:
$1,710,956
$18,467 596,823 $430 73 $10,201 1,409 $743,387 - $18,467
596,823
kWh
$430
73
kW-months/year
$10,201
1,409
MMBtu
$743,387
-
$
TOTAL IMPLEMENTED Savings:
$11,127
Cost:
$5,034
$5,275 170,478 $430 73 $5,422 749 - - $5,275
170,478
kWh
$430
73
kW-months/year
$5,422
749
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $