IAC Assessment: BS0012
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0012
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2013
Principal Product Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $1,000,000-$5,000,000
# of Employees 160
Plant Area (Sq.Ft.) 352,939
Annual Production 250,000,000 Thousand Feet
Production Hrs. Annual 5,000
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,271,820 26,917,770 kWh $0.05
Electricity Demand $228,756 57,580 kW-months/year $3.97
Wood $528,450 1,004,063 MMBtu $0.53
TOTAL ENERGY COSTS $2,029,026
RECOMMENDED SAVINGS* $46,940 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,676
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Electricity Usage Electricity Demand Wood
$ kWh $ kW-months/year $ MMBtu
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,483
Cost:
$900
$1,483 31,417 - - - - $1,483
31,417
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,601
Cost:
$8,272
$3,601 74,580 - - - - $3,601
74,580
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,998
Cost:
-
$5,998 127,086 - - - - $5,998
127,086
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,065
Cost:
$8,525
$1,848 39,328 $217 55 - - $1,848
39,328
kWh
$217
55
kW-months/year
-
-
MMBtu
05: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$11,249
Cost:
$3,500
$11,249 253,300 - - - - $11,249
253,300
kWh
-
-
kW-months/year
-
-
MMBtu
06: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$1,098
Cost:
$422
$1,098 20,839 - - - - $1,098
20,839
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,594
Cost:
$26,100
$3,218 68,181 $376 95 - - $3,218
68,181
kWh
$376
95
kW-months/year
-
-
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,596
Cost:
$6,725
$2,324 49,248 $272 68 - - $2,324
49,248
kWh
$272
68
kW-months/year
-
-
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,916
Cost:
$14,075
$13,356 282,960 $1,560 393 - - $13,356
282,960
kWh
$1,560
393
kW-months/year
-
-
MMBtu
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$340
Cost:
$2,905
- - - - $340 653 -
-
kWh
-
-
kW-months/year
$340
653
MMBtu
TOTAL RECOMMENDED Savings:
$46,940
Cost:
$71,424
$44,176 946,939 $2,424 611 $340 653 $44,176
946,939
kWh
$2,424
611
kW-months/year
$340
653
MMBtu
TOTAL IMPLEMENTED Savings:
$14,676
Cost:
$35,272
$14,300 301,264 $376 95 - - $14,300
301,264
kWh
$376
95
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Wood Electricity Usage Electricity Demand Wood