IAC logo
IAC Assessment: BS0013
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0013
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2013
Principal Product Grain Silos
NAICS 332311 - Prefabricated Metal Building and Component Manufacturing
SIC 3448 - Prefabricated Metal Buildings
Sales $10,000,000-$50,000,000
# of Employees 264
Plant Area (Sq.Ft.) 94,760
Annual Production 20,250 Tons
Production Hrs. Annual 4,320
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,419 1,754,360 kWh $0.07
Electricity Demand $35,907 5,969 kW-months/year $6.02
Electricity Fees $747 - $ -
Natural Gas $13,145 1,602 MMBtu $8.21
TOTAL ENERGY COSTS $175,219
RECOMMENDED SAVINGS* $9,853 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,560
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,038
Cost:
$5,639
$1,672 23,391 $365 61 - - $1,672
23,391
kWh
$365
61
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,210
Cost:
$20
$4,210 58,876 - - - - $4,210
58,876
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$199
Cost:
$250
$199 2,796 - - - - $199
2,796
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,825
Cost:
$22,200
$(-771) (-10,790) - - $2,597 316 $(-771)
(-10,790)
kWh
-
-
kW-months/year
$2,597
316
MMBtu
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$312
Cost:
$77
- - - - $312 38 -
-
kWh
-
-
kW-months/year
$312
38
MMBtu
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$1,270
Cost:
$360
- - - - $1,270 155 -
-
kWh
-
-
kW-months/year
$1,270
155
MMBtu
TOTAL RECOMMENDED Savings:
$9,853
Cost:
$28,546
$5,309 74,273 $365 61 $4,179 509 $5,309
74,273
kWh
$365
61
kW-months/year
$4,179
509
MMBtu
TOTAL IMPLEMENTED Savings:
$6,560
Cost:
$5,736
$5,882 82,267 $365 61 $312 38 $5,882
82,267
kWh
$365
61
kW-months/year
$312
38
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas