IAC logo
IAC Assessment: BS0014
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0014
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2013
Principal Product Construction Equipment
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 140,000
Annual Production 225,000 Pieces
Production Hrs. Annual 2,000
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,307 1,383,920 kWh $0.04
Electricity Demand $26,466 4,621 kW-months/year $5.73
Electricity Fees $10,352 - $ -
Natural Gas $68,498 9,893 MMBtu $6.92
Fuel Oil #2 $664 17 MMBtu $38.34
TOTAL ENERGY COSTS $162,287
RECOMMENDED SAVINGS* $28,961 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,378
Cost:
$1,732
$5,378 132,186 - - - - - - - - $5,378
132,186
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,556
Cost:
$523
$1,556 38,251 - - - - - - - - $1,556
38,251
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$7,448
Cost:
$7,432
$(-266) (-6,528) $(-224) (-39) $7,938 1,165 - - - - $(-266)
(-6,528)
kWh
$(-224)
(-39)
kW-months/year
$7,938
1,165
MMBtu
-
-
MMBtu
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,948
Cost:
$14,095
- - - - $3,948 579 - - - - -
-
kWh
-
-
kW-months/year
$3,948
579
MMBtu
-
-
MMBtu
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$9,647
Cost:
$48,320
$125 3,061 $66 12 $8,177 1,200 - - $1,280 - $125
3,061
kWh
$66
12
kW-months/year
$8,177
1,200
MMBtu
-
-
MMBtu
$1,280
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$94
Cost:
$230
$94 2,302 - - - - - - - - $94
2,302
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$79
Cost:
$324
$79 1,940 - - - - - - - - $79
1,940
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$621
Cost:
$299
$(-43) (-1,067) - - - - $664 17 - - $(-43)
(-1,067)
kWh
-
-
kW-months/year
-
-
MMBtu
$664
17
MMBtu
-
-
$
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$190
Cost:
$180
$190 4,662 - - - - - - - - $190
4,662
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$28,961
Cost:
$73,135
$7,113 174,807 $(-158) (-28) $20,063 2,944 $664 17 $1,280 - $7,113
174,807
kWh
$(-158)
(-28)
kW-months/year
$20,063
2,944
MMBtu
$664
17
MMBtu
$1,280
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Ancillary Material Cost