Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Boise State University |
---|---|
Assessment Year | 2013 |
Principal Product | Construction Equipment |
NAICS | 333120 - Construction Machinery Manufacturing |
SIC | 3531 - Construction Machinery |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 140,000 |
Annual Production | 225,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | ID |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $56,307 | 1,383,920 | kWh | $0.04 |
Electricity Demand | $26,466 | 4,621 | kW-months/year | $5.73 |
Electricity Fees | $10,352 | - | $ | - |
Natural Gas | $68,498 | 9,893 | MMBtu | $6.92 |
Fuel Oil #2 | $664 | 17 | MMBtu | $38.34 |
TOTAL ENERGY COSTS | $162,287 | |||
RECOMMENDED SAVINGS* | $28,961 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $5,378 Cost: $1,732 |
$5,378 | 132,186 | - | - | - | - | - | - | - | - |
$5,378 132,186 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,556 Cost: $523 |
$1,556 | 38,251 | - | - | - | - | - | - | - | - |
$1,556 38,251 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2447 HEAT WATER WITH EXHAUST HEAT |
Savings: $7,448 Cost: $7,432 |
$(-266) | (-6,528) | $(-224) | (-39) | $7,938 | 1,165 | - | - | - | - |
$(-266) (-6,528) kWh |
$(-224) (-39) kW-months/year |
$7,938 1,165 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $3,948 Cost: $14,095 |
- | - | - | - | $3,948 | 579 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,948 579 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $9,647 Cost: $48,320 |
$125 | 3,061 | $66 | 12 | $8,177 | 1,200 | - | - | $1,280 | - |
$125 3,061 kWh |
$66 12 kW-months/year |
$8,177 1,200 MMBtu |
- - MMBtu |
$1,280 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $94 Cost: $230 |
$94 | 2,302 | - | - | - | - | - | - | - | - |
$94 2,302 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $79 Cost: $324 |
$79 | 1,940 | - | - | - | - | - | - | - | - |
$79 1,940 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $621 Cost: $299 |
$(-43) | (-1,067) | - | - | - | - | $664 | 17 | - | - |
$(-43) (-1,067) kWh |
- - kW-months/year |
- - MMBtu |
$664 17 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $190 Cost: $180 |
$190 | 4,662 | - | - | - | - | - | - | - | - |
$190 4,662 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,961 Cost: $73,135 |
$7,113 | 174,807 | $(-158) | (-28) | $20,063 | 2,944 | $664 | 17 | $1,280 | - | $7,113 174,807 kWh |
$(-158) (-28) kW-months/year |
$20,063 2,944 MMBtu |
$664 17 MMBtu |
$1,280 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Ancillary Material Cost |