Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Boise State University |
---|---|
Assessment Year | 2013 |
Principal Product | Toiletry Preparations |
NAICS | 325620 - Toilet Preparation Manufacturing |
SIC | 2844 - Toilet Preparations |
Sales | $10,000,000-$50,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 103,500 |
Annual Production | 2,600,000 Pieces |
Production Hrs. Annual | 2,040 |
Location (State) | ID |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $25,364 | 611,840 | kWh | $0.04 |
Electricity Demand | $9,120 | 1,725 | kW-months/year | $5.29 |
Electricity Fees | $202 | - | $ | - |
Natural Gas | $8,562 | 1,197 | MMBtu | $7.15 |
TOTAL ENERGY COSTS | $43,248 | |||
RECOMMENDED SAVINGS* | $1,555 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $969 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $96 Cost: $241 |
$61 | 1,468 | $35 | 7 | - | - | - | - |
$61 1,468 kWh |
$35 7 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $105 Cost: $140 |
$105 | 2,522 | - | - | - | - | - | - |
$105 2,522 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $165 Cost: $50 |
$165 | 3,989 | - | - | - | - | - | - |
$165 3,989 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $211 Cost: $979 |
- | - | - | - | $211 | 30 | - | - |
- - kWh |
- - kW-months/year |
$211 30 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $607 Cost: $990 |
- | - | - | - | $607 | 87 | - | - |
- - kWh |
- - kW-months/year |
$607 87 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $127 Cost: $747 |
$(-86) | (-2,082) | - | - | $213 | 30 | - | - |
$(-86) (-2,082) kWh |
- - kW-months/year |
$213 30 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $93 Cost: $1,073 |
$93 | 2,250 | - | - | - | - | - | - |
$93 2,250 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4151 MINIMIZE WATER USAGE |
Savings: $151 Cost: $59 |
$108 | 2,594 | - | - | - | - | $43 | - |
$108 2,594 kWh |
- - kW-months/year |
- - MMBtu |
$43 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,555 Cost: $4,279 |
$446 | 10,741 | $35 | 7 | $1,031 | 147 | $43 | - | $446 10,741 kWh |
$35 7 kW-months/year |
$1,031 147 MMBtu |
$43 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $969 Cost: $2,028 |
$108 | 2,594 | - | - | $818 | 117 | $43 | - | $108 2,594 kWh |
- - kW-months/year |
$818 117 MMBtu |
$43 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption |