Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The Assessment Recommendation Codes ARC is a system for classifying recommendations.
[Manual]
TOP | ARC | Description | Recommendations Reccs | Recommended $ Savings | Average Payback (yrs) | Implementation Rate Imp Rate | |
---|---|---|---|---|---|---|---|
back | 2.xxxx | 2.xxxx ENERGY MANAGEMENT | 145,123 | $2,086,281,888 | 1.8 | 51.0% | |
back | 2.1xxx | 2.1xxx Combustion Systems | 8,386 | $240,644,039 | 1.5 | 47.2% | |
back | 2.11xx | 2.11xx FURNACES, OVENS AND DIRECTLY FIRED OPERATIONS | 1,631 | $50,006,033 | 1.1 | 46.9% | |
2.111x | 2.111x Operations | 460 | $26,236,624 | 1.0 | 42.6% | ||
2.1111 | 2.1111 CONTROL PRESSURE ON STEAMER OPERATIONS | 19 | $596,598 | 0.5 | 41.2% | ||
2.1112 | 2.1112 HEAT OIL TO PROPER TEMPERATURE FOR GOOD ATOMIZATION | 1 | $154,042 | 0.0 | -% | ||
2.1113 | 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM | 226 | $9,189,675 | 0.7 | 48.6% | ||
2.1114 | 2.1114 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | 24 | $6,976,568 | 0.7 | 57.9% | ||
2.1115 | 2.1115 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS | 9 | $467,228 | 0.4 | 37.5% | ||
2.1116 | 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY | 164 | $7,775,015 | 1.6 | 36.8% | ||
2.1117 | 2.1117 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | 17 | $1,077,498 | 0.8 | 0.0% |