IAC logo
IAC Assessment: BS0017
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0017
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2013
Principal Product Boats
NAICS 336612 - Boat Building
SIC 3732 - Boat Building And Repairing
Sales $10,000,000-$50,000,000
# of Employees 68
Plant Area (Sq.Ft.) 32,240
Annual Production 442 Pieces
Production Hrs. Annual 2,080
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,788 365,152 kWh $0.08
Electricity Demand $9,922 1,586 kW-months/year $6.26
Natural Gas $14,937 1,856 MMBtu $8.05
TOTAL ENERGY COSTS $52,646
RECOMMENDED SAVINGS* $5,008 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,010
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$268
Cost:
$182
$268 3,348 - - $268
3,348
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$391
Cost:
$977
$391 4,893 - - $391
4,893
kWh
-
-
MMBtu
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$1,029
Cost:
$4,500
$1,029 12,858 - - $1,029
12,858
kWh
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$207
Cost:
$48
$207 2,583 - - $207
2,583
kWh
-
-
MMBtu
05: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$998
Cost:
$1,134
- - $998 125 -
-
kWh
$998
125
MMBtu
06: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$2,115
Cost:
$2,167
$2,115 26,436 - - $2,115
26,436
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$5,008
Cost:
$9,008
$4,010 50,118 $998 125 $4,010
50,118
kWh
$998
125
MMBtu
TOTAL IMPLEMENTED Savings:
$4,010
Cost:
$7,874
$4,010 50,118 - - $4,010
50,118
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas