Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Boise State University |
---|---|
Assessment Year | 2014 |
Principal Product | Dried Milk Product |
NAICS | 311514 - Dry, Condensed, and Evaporated Dairy Product Manufacturing |
SIC | 2023 - Dry, Condensed, Evaporated Products |
Sales | $5,000,000-$10,000,000 |
# of Employees | 106 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 182,500,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | ID |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,203,148 | 33,007,811 | kWh | $0.04 |
Electricity Demand | $372,112 | 55,720 | kW-months/year | $6.68 |
Electricity Fees | $3,732 | - | $ | - |
Natural Gas | $2,173,353 | 463,112 | MMBtu | $4.69 |
TOTAL ENERGY COSTS | $3,752,344 | |||
RECOMMENDED SAVINGS* | $102,031 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $93,880 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,764 Cost: $1,960 |
$2,906 | 79,717 | $858 | 128 | - | - | - | - |
$2,906 79,717 kWh |
$858 128 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $10,219 Cost: $7,950 |
$10,219 | 280,355 | - | - | - | - | - | - |
$10,219 280,355 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,895 Cost: $15,396 |
$7,895 | 216,599 | - | - | - | - | - | - |
$7,895 216,599 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $8,837 Cost: $449 |
- | - | - | - | $8,837 | 1,992 | - | - |
- - kWh |
- - kW-months/year |
$8,837 1,992 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $60,962 Cost: $13,425 |
- | - | - | - | $55,275 | 12,461 | $5,687 | - |
- - kWh |
- - kW-months/year |
$55,275 12,461 MMBtu |
$5,687 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $6,297 Cost: $380 |
- | - | - | - | $6,297 | 1,420 | - | - |
- - kWh |
- - kW-months/year |
$6,297 1,420 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $1,854 Cost: $4,175 |
$1,854 | 50,878 | - | - | - | - | - | - |
$1,854 50,878 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,203 Cost: $15,635 |
$2,203 | 60,444 | - | - | - | - | - | - |
$2,203 60,444 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $102,031 Cost: $59,370 |
$25,077 | 687,993 | $858 | 128 | $70,409 | 15,872 | $5,687 | - | $25,077 687,993 kWh |
$858 128 kW-months/year |
$70,409 15,872 MMBtu |
$5,687 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $93,880 Cost: $54,815 |
$23,223 | 637,115 | $858 | 128 | $64,112 | 14,453 | $5,687 | - | $23,223 637,115 kWh |
$858 128 kW-months/year |
$64,112 14,453 MMBtu |
$5,687 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption |