IAC Assessment: BS0033
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0033
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2014
Principal Product Mining Equipment
NAICS 333131 - Mining Machinery and Equipment Manufacturing
SIC 3532 - Mining Machinery
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 120,000
Annual Production 172 Pieces
Production Hrs. Annual 2,080
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,260 1,126,093 kWh $0.07
Electricity Demand $31,637 6,296 kW-months/year $5.02
Natural Gas $106,231 15,181 MMBtu $7.00
TOTAL ENERGY COSTS $211,128
RECOMMENDED SAVINGS* $34,250 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2111 INSTALL STEAM TRAP Savings:
$123
Cost:
$217
$123 1,890 - - - - - - $123
1,890
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,073
Cost:
$15
$686 10,558 $387 77 - - - - $686
10,558
kWh
$387
77
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$263
Cost:
$168
$263 4,052 - - - - - - $263
4,052
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$464
Cost:
$10
$464 7,139 - - - - - - $464
7,139
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,302
Cost:
$17,525
$(-328) (-5,040) - - $4,630 760 - - $(-328)
(-5,040)
kWh
-
-
kW-months/year
$4,630
760
MMBtu
-
-
$
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$2,800
Cost:
$2,668
- - - - $2,800 400 - - -
-
kWh
-
-
kW-months/year
$2,800
400
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,179
Cost:
$360
$1,502 23,113 - - - - $677 - $1,502
23,113
kWh
-
-
kW-months/year
-
-
MMBtu
$677
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,767
Cost:
$23,688
$1,240 19,080 $527 105 - - - - $1,240
19,080
kWh
$527
105
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$33
Cost:
$160
$33 508 - - - - - - $33
508
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$21,246
Cost:
$1,547
- - - - $21,246 3,036 - - -
-
kWh
-
-
kW-months/year
$21,246
3,036
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$34,250
Cost:
$46,358
$3,983 61,300 $914 182 $28,676 4,196 $677 - $3,983
61,300
kWh
$914
182
kW-months/year
$28,676
4,196
MMBtu
$677
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost