IAC Assessment: BS0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2014
Principal Product Airport Products
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $100,000,000-$500,000,000
# of Employees 312
Plant Area (Sq.Ft.) 215,000
Annual Production 468 Units
Production Hrs. Annual 2,125
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $122,043 3,416,400 kWh $0.04
Electricity Demand $188,902 12,013 kW-months/year $15.72
Electricity Fees $4,344 - $ -
Natural Gas $190,010 43,692 MMBtu $4.35
LPG $17,537 988 MMBtu $17.75
TOTAL ENERGY COSTS $522,836
RECOMMENDED SAVINGS* $169,598 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,995
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,406
Cost:
$20,000
- - - - $10,406 - - - -
-
kWh
-
-
kW-months/year
$10,406
-
$
-
-
MMBtu
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$74,212
Cost:
$31,860
$24,162 676,372 $50,050 3,183 - - - - $24,162
676,372
kWh
$50,050
3,183
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$53,966
Cost:
$45,410
$18,377 514,429 - - - - $35,589 8,184 $18,377
514,429
kWh
-
-
kW-months/year
-
-
$
$35,589
8,184
MMBtu
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$14,073
Cost:
$49,835
$(-223) (-6,237) $(-490) (-31) - - $14,786 3,400 $(-223)
(-6,237)
kWh
$(-490)
(-31)
kW-months/year
-
-
$
$14,786
3,400
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,083
Cost:
$304
- - - - - - $7,083 1,629 -
-
kWh
-
-
kW-months/year
-
-
$
$7,083
1,629
MMBtu
06: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$2,513
Cost:
$2,503
- - - - - - $2,513 578 -
-
kWh
-
-
kW-months/year
-
-
$
$2,513
578
MMBtu
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$946
Cost:
$2,100
$946 26,484 - - - - - - $946
26,484
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,850
Cost:
$255
$4,850 135,780 - - - - - - $4,850
135,780
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,549
Cost:
$4,061
$544 15,234 $1,005 64 - - - - $544
15,234
kWh
$1,005
64
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$169,598
Cost:
$156,328
$48,656 1,362,062 $50,565 3,216 $10,406 - $59,971 13,790 $48,656
1,362,062
kWh
$50,565
3,216
kW-months/year
$10,406
-
$
$59,971
13,790
MMBtu
TOTAL IMPLEMENTED Savings:
$15,995
Cost:
$7,123
$5,394 151,014 $1,005 64 - - $9,596 2,206 $5,394
151,014
kWh
$1,005
64
kW-months/year
-
-
$
$9,596
2,206
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas