IAC Assessment: BS0036
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0036
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2014
Principal Product Railroad Equipment
NAICS 336510 - Railroad Rolling Stock Manufacturing
SIC 3743 - Railroad Equipment
Sales $100,000,000-$500,000,000
# of Employees 536
Plant Area (Sq.Ft.) 300,000
Annual Production 55 Pieces
Production Hrs. Annual 5,460
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $299,553 6,543,278 kWh $0.05
Electricity Demand $98,857 14,437 kW-months/year $6.85
Electricity Fees $3,642 - $ -
Natural Gas $296,026 54,996 MMBtu $5.38
TOTAL ENERGY COSTS $698,078
RECOMMENDED SAVINGS* $72,954 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,861
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$17,744
Cost:
$26,100
- - - - $17,744 3,296 -
-
kWh
-
-
kW-months/year
$17,744
3,296
MMBtu
02: 2.7495 INSTALL REPLACEMENT DOORS Savings:
$4,556
Cost:
$17,436
- - - - $4,556 846 -
-
kWh
-
-
kW-months/year
$4,556
846
MMBtu
03: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$16,582
Cost:
$31,134
- - - - $16,582 3,080 -
-
kWh
-
-
kW-months/year
$16,582
3,080
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,961
Cost:
$10,130
- - - - $2,961 550 -
-
kWh
-
-
kW-months/year
$2,961
550
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$10,250
Cost:
$11,371
- - - - $10,250 1,904 -
-
kWh
-
-
kW-months/year
$10,250
1,904
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,963
Cost:
$937
$3,289 71,382 $674 98 - - $3,289
71,382
kWh
$674
98
kW-months/year
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,898
Cost:
$2,032
$12,393 270,712 $4,505 658 - - $12,393
270,712
kWh
$4,505
658
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$72,954
Cost:
$99,140
$15,682 342,094 $5,179 756 $52,093 9,677 $15,682
342,094
kWh
$5,179
756
kW-months/year
$52,093
9,677
MMBtu
TOTAL IMPLEMENTED Savings:
$20,861
Cost:
$2,969
$15,682 342,094 $5,179 756 - - $15,682
342,094
kWh
$5,179
756
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas