IAC logo
IAC Assessment: BS0039
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0039
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2014
Principal Product Cooked Frozen Meat
NAICS 311615 - Poultry Processing
SIC 2015 - Poultry Slaughtering And Processing
Sales $5,000,000-$10,000,000
# of Employees 175
Plant Area (Sq.Ft.) 39,000
Annual Production 13,500,000 Pounds
Production Hrs. Annual 8,760
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,292 1,791,083 kWh $0.05
Electricity Demand $18,758 3,677 kW-months/year $5.10
Electricity Fees $585 - $ -
Natural Gas $146,655 28,559 MMBtu $5.14
TOTAL ENERGY COSTS $502,290
RECOMMENDED SAVINGS* $6,662 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,096
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$353
Cost:
$214
$353 6,581 - - - - - - - - $353
6,581
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$680
Cost:
$1,366
$601 11,172 $79 16 - - - - - - $601
11,172
kWh
$79
16
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$454
Cost:
$241
$401 7,467 $52 10 - - - - - - $401
7,467
kWh
$52
10
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,566
Cost:
$2,809
- - - - $2,566 500 - - - - -
-
kWh
-
-
kW-months/year
$2,566
500
MMBtu
-
-
Tgal
-
-
Tgal
05: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$1,992
Cost:
$4,512
$1,992 37,054 - - - - - - - - $1,992
37,054
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$81
Cost:
$87
$57 1,060 $24 5 - - - - - - $57
1,060
kWh
$24
5
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
07: 3.4151 MINIMIZE WATER USAGE Savings:
$535
Cost:
$114
- - - - $143 28 $264 66 $128 - -
-
kWh
-
-
kW-months/year
$143
28
MMBtu
$264
66
Tgal
$128
-
Tgal
TOTAL RECOMMENDED Savings:
$6,662
Cost:
$9,343
$3,404 63,334 $156 31 $2,709 528 $264 66 $128 - $3,404
63,334
kWh
$156
31
kW-months/year
$2,709
528
MMBtu
$264
66
Tgal
$128
-
Tgal
TOTAL IMPLEMENTED Savings:
$4,096
Cost:
$6,534
$3,404 63,334 $156 31 $143 28 $264 66 $128 - $3,404
63,334
kWh
$156
31
kW-months/year
$143
28
MMBtu
$264
66
Tgal
$128
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Water Consumption