IAC Assessment: BS0041
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2014
Principal Product Composite Structures
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 59,300
Annual Production 48,000 Pieces
Production Hrs. Annual 4,300
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,352 2,040,008 kWh $0.06
Electricity Demand $33,574 6,896 kW-months/year $4.87
Natural Gas $46,863 5,024 MMBtu $9.33
TOTAL ENERGY COSTS $210,789
RECOMMENDED SAVINGS* $19,625 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,789
Cost:
$8,520
$1,410 22,023 $1,379 283 - - - - $1,410
22,023
kWh
$1,379
283
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,000
Cost:
$180
$727 11,365 - - - - $273 - $727
11,365
kWh
-
-
kW-months/year
-
-
MMBtu
$273
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$988
Cost:
$5,580
$828 12,947 $160 33 - - - - $828
12,947
kWh
$160
33
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$156
Cost:
$480
$156 2,448 - - - - - - $156
2,448
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,010
Cost:
$3,900
$3,010 47,038 - - - - - - $3,010
47,038
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,476
Cost:
$15
$1,337 20,886 $139 29 - - - - $1,337
20,886
kWh
$139
29
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$398
Cost:
$722
$398 6,218 - - - - - - $398
6,218
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$930
Cost:
$285
$930 14,529 - - - - - - $930
14,529
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$118
Cost:
$292
$118 1,846 - - - - - - $118
1,846
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
10: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,324
Cost:
$15,600
$2,784 43,504 - - $5,540 594 - - $2,784
43,504
kWh
-
-
kW-months/year
$5,540
594
MMBtu
-
-
$
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$436
Cost:
$1,128
$436 6,810 - - - - - - $436
6,810
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$19,625
Cost:
$36,702
$12,134 189,614 $1,678 345 $5,540 594 $273 - $12,134
189,614
kWh
$1,678
345
kW-months/year
$5,540
594
MMBtu
$273
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes